Saint Paul, MN
Average peak power unavailable
7 kW maximum
First tracked Oct 12, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Saint Paul, MN
Average peak power unavailable
7 kW maximum
First tracked Oct 12, 2024
Beaver Creek, CO
Average peak power unavailable
12 kW maximum
First tracked Oct 12, 2024
Ashland, OR
Average peak power unavailable
7 kW maximum
First tracked Oct 12, 2024
South Windsor, CT
Average peak power unavailable
19 kW maximum
First tracked Oct 11, 2024
Bel Air, MD
Average peak power unavailable
10 kW maximum
First tracked Oct 11, 2024
Mt Wolf, PA
Average peak power unavailable
12 kW maximum
First tracked Oct 11, 2024
Mount Wolf, PA
Average peak power unavailable
12 kW maximum
First tracked Oct 11, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Charlotte, NC
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Lafayette, IN
122 kW avg peak
350 kW maximum
First tracked Oct 11, 2024
Altoona, IA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Altoona, IA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Altoona, IA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Altoona, IA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Fort Collins, CO
93 kW avg peak
125 kW maximum
First tracked Oct 11, 2024
Albuquerque, NM
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 11, 2024
Patterson, CA
Average peak power unavailable
15 kW maximum
First tracked Oct 11, 2024
Sonoma, CA
Average peak power unavailable
12 kW maximum
First tracked Oct 11, 2024
Vancouver, WA
Average peak power unavailable
10 kW maximum
First tracked Oct 11, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
145 E 7TH 145 STATION
Saint Paul, MN
Operational First tracked Oct 12, 2024 |
Operational | — | 7 kW | Oct 12, 2024 |
|
PARK PLAZA BC 4
Beaver Creek, CO
Unknown First tracked Oct 12, 2024 |
Unknown | — | 12 kW | Oct 12, 2024 |
|
SAFEWAY
Ashland, OR
Operational First tracked Oct 12, 2024 |
Operational | — | 7 kW | Oct 12, 2024 |
|
TOSW LIBRARY STATION 1
South Windsor, CT
Operational First tracked Oct 11, 2024 |
Operational | — | 19 kW | Oct 11, 2024 |
|
WAGNER PROP WAGNER 1
Bel Air, MD
Operational First tracked Oct 11, 2024 |
Operational | — | 10 kW | Oct 11, 2024 |
|
EMERSON FLATS EMERSON FLATS 2
Mt Wolf, PA
Operational First tracked Oct 11, 2024 |
Operational | — | 12 kW | Oct 11, 2024 |
|
EMERSON FLATS EMERSON FLATS 1
Mount Wolf, PA
Operational First tracked Oct 11, 2024 |
Operational | — | 12 kW | Oct 11, 2024 |
|
UPMC TOWERVIEW #2
Pittsburgh, PA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
OBE HILTON CHRLOT
Charlotte, NC
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
FIVE STAR
Lafayette, IN Reliability C Operational First tracked Oct 11, 2024 |
Operational | 122 kW | 350 kW | Oct 11, 2024 |
|
FBSICULUS PCI 56
Altoona, IA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
FBSICULUS PCI 3-4
Altoona, IA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
FBSICULUS PEMB
Altoona, IA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
FBSICULUS PCI 12
Altoona, IA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
GPM INVESTMENTS 4587 DC
Fort Collins, CO Reliability C Operational First tracked Oct 11, 2024 |
Operational | 93 kW | 125 kW | Oct 11, 2024 |
|
OBE EMBASSY ALBUQ
Albuquerque, NM
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
1500 IOWA STATION
Riverside, CA
Operational First tracked Oct 11, 2024 |
Operational | — | 7 kW | Oct 11, 2024 |
|
CITYOFPATTERSON CH-NEW
Patterson, CA
Operational First tracked Oct 11, 2024 |
Operational | — | 15 kW | Oct 11, 2024 |
|
EV CHANDON EV
Sonoma, CA
Operational First tracked Oct 11, 2024 |
Operational | — | 12 kW | Oct 11, 2024 |
|
CPU EC 2
Vancouver, WA
Operational First tracked Oct 11, 2024 |
Operational | — | 10 kW | Oct 11, 2024 |