24,377
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

THE VIV HOTEL STATION

Anaheim, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 5, 2024

CSG EV CARSO

Carson, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 5, 2024

SIA SIA/LOT C

Spokane, WA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 5, 2024

CTKLUTHERAN CTKLUTHERAN

Torrance, CA

Operational

Average peak power unavailable

15 kW maximum

First tracked Dec 5, 2024

BELLINGHAM CITY CAROLINA

Bellingham, WA

Operational Reliability B

86 kW avg peak

125 kW maximum

First tracked Dec 5, 2024

BRUCEGROUP GM-L3-1

Middleton, NS

Operational

Average peak power unavailable

63 kW maximum

First tracked Dec 4, 2024

60 BIRMINGHAM EV 3

Toronto, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

MAPLE MANOR MKV STATION

Springdale, OH

Operational

Average peak power unavailable

4 kW maximum

First tracked Dec 4, 2024

GCHS EAST LOT CENTRAL

Grayslake, IL

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

VGLNG STATION 1

Cameron, LA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

ATC SOUTH STATION 1

Manhattan, KS

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 4, 2024

GPM INVESTMENTS 4581 DC

Aurora, CO

Operational Reliability B

93 kW avg peak

160 kW maximum

First tracked Dec 4, 2024

HENSLEY AT THE HENSLEY

Centennial, CO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

GPM INVESTMENTS 4588 DC

Colorado Springs, CO

Operational Reliability A

104 kW avg peak

160 kW maximum

First tracked Dec 4, 2024

CHASE CENTER P

San Francisco, CA

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 4, 2024

TOL REDWDS PUBLIC 1

Langley Township, BC

Operational

Average peak power unavailable

8 kW maximum

First tracked Dec 4, 2024

CFA 05192 CFAWOODBURN1

Woodburn, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

CFA 05192 CFAWOODBURN2

Woodburn, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

HOLY CROSS HOGAN LOT

Worcester, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 3, 2024

Page 347 of 1219

This action cannot be undone.