ChargePoint
B+31,326
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Salem, OR
19kW max
Redmond, WA
7kW max
Clayton, DE
7kW max
Cedar Valley, UT
7kW max
Irvine, CA
7kW max
Pflugerville, TX
7kW max
Austin, TX
7kW max
Macungie, PA
7kW max
Columbia, MD
7kW max
Livermore, CA
10kW max
Chino Hills, CA
8kW max
Sacramento, CA
8kW max
Broken Arrow, OK
63kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| META_REDMOND AVALORE (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND X (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND NEVERMIND (Redmond, WA) | — | 7 | 01 Feb | ||
| OCULUS VR WCE (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND ORIGIN 2 (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND GENESIS (Redmond, WA) | — | 7 | 01 Feb | ||
| OCULUS VR DROP SHOT (Redmond, WA) | — | 7 | 01 Feb | ||
| LIFESOURCE 1 LIFESOURCE 1 (Salem, OR) | — | 19 | 01 Feb | ||
| META_REDMOND WILDSTAR (Redmond, WA) | — | 7 | 01 Feb | ||
| RAIL ROAD SQ STATION 1 (Clayton, DE) | — | 7 | 01 Feb | ||
| NORAM STATION (Cedar Valley, UT) | — | 7 | 01 Feb | ||
| IRVINE CO OFC UCIRP 5271 0 (Irvine, CA) | — | 7 | 01 Feb | ||
| NORAM STATION (Pflugerville, TX) | — | 7 | 01 Feb | ||
| NORAM DOMAIN (Austin, TX) | — | 7 | 01 Feb | ||
| BCMR CP 2021 STATION (Macungie, PA) | — | 7 | 31 Jan | ||
| HOWARD COUNTY EAST COLUMBIA (Columbia, MD) | — | 7 | 31 Jan | ||
| LDC-PP SPACE (Livermore, CA) | — | 10 | 31 Jan | ||
| HIEX UNIT (Chino Hills, CA) | — | 8 | 31 Jan | ||
| UOP CHARGERS SAC LOT 5 (Sacramento, CA) | — | 8 | 31 Jan | ||
| CHRIS NIKEL EV CHRIS NIKEL (Broken Arrow, OK) | — | 63 | 31 Jan |