24,293
Sites
83
Avg peak power

See your own charging sessions

Link your Rivian account to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

CAMROSE TOYOTA CAMROSE 2

Camrose, AB

Operational

Average peak power unavailable

12 kW maximum

First tracked May 2, 2026

FREEDOM FORD CHARGER

Edmonton, AB

Operational

Average peak power unavailable

35 kW maximum

First tracked May 2, 2026

MBB-CHARGEPOINT CPE PLUS

Vancouver, BC

Operational

Average peak power unavailable

120 kW maximum

First tracked May 2, 2026

BROADSTREET CEDAR

Campbell River, BC

Operational

Average peak power unavailable

10 kW maximum

First tracked May 2, 2026

MBB-CHARGEPOINT CPE

Vancouver, BC

Operational

Average peak power unavailable

63 kW maximum

First tracked May 2, 2026

REXEL CORPORATE REXEL

Mississauga, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

CAWTHRA CC CAWTHRA CC

Mississauga, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

LL THERAPY LLCFT

Spokane Valley, WA

Operational

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

SALISH SEASONS

Sequim, WA

Operational

Average peak power unavailable

12 kW maximum

First tracked May 2, 2026

WAPATO 1 1

Wapato, WA

Operational

Average peak power unavailable

8 kW maximum

First tracked May 2, 2026

ROSEMARY RIDGE STATION 1

Needham, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

REVISION ENERGY

Epping, NH

Operational

Average peak power unavailable

125 kW maximum

First tracked May 2, 2026

DUPAGE CO DUPAGE CARE 1

Wheaton, IL

Operational

Average peak power unavailable

63 kW maximum

First tracked May 2, 2026

POSEN HALL POSEN HALL

Posen, IL

Operational

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

MONARCHY CP6021(50A

Sun Prairie, WI

Operational

Average peak power unavailable

12 kW maximum

First tracked May 2, 2026

BUILDING 4 STATION 4A

Woodbridge Township, NJ

Operational

Average peak power unavailable

12 kW maximum

First tracked May 2, 2026

LONDONDERRY INN STATION

Palmyra, PA

Operational

Average peak power unavailable

12 kW maximum

First tracked May 2, 2026

COMMERCE AVE STATION 2

Greencastle, PA

Unknown

Average peak power unavailable

7 kW maximum

First tracked May 2, 2026

Page 30 of 1215