Arlington, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Arlington, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Milton, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Arlington, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Boston, MA
58 kW avg peak
63 kW maximum
First tracked Jan 10, 2025
Somerville, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Burlington, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Watertown, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Watertown, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Medford, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Newton, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Norwood, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Burlington, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Medford, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Agawam, MA
Average peak power unavailable
350 kW maximum
First tracked Jan 10, 2025
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Needham, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
ARLINGTON MA 85 PARK AVE
Arlington, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
BULFINCH GARAGE A EV
Cambridge, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
MILTON ACADEMY VAN LOT
Milton, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
ARLINGTON MA RAILROAD LOT
Arlington, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
375 LONGWOOD P4
Boston, MA Reliability C Operational First tracked Jan 10, 2025 |
Operational | 58 kW | 63 kW | Jan 10, 2025 |
|
SOMERVILLE MA TEELE ST1
Somerville, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
LHMC LOT
Burlington, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
ARSENAL YARDS RED GARAGE 2
Watertown, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
HOSMER SCH HOSMER
Watertown, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
MEDFORD LIBRARY 1
Medford, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
UMASS AMHERST MT IDA 3
Newton, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
EV STATION AT NOR. AIRPORT
Norwood, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
VAN NESS VAN NESS1
Boston, MA
Unknown First tracked Jan 10, 2025 |
Unknown | — | 7 kW | Jan 10, 2025 |
|
BRIGHTON LANDIN
Boston, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
VAN NESS VN 4
Boston, MA
Unknown First tracked Jan 10, 2025 |
Unknown | — | 7 kW | Jan 10, 2025 |
|
PIEDMONT 25 MALL 0
Burlington, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
TUFTS U. TUFTS GRANOFF
Medford, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
SARATFL PL-01
Agawam, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 350 kW | Jan 10, 2025 |
|
RELATED BEAL STATION
Boston, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
140 CHARGER
Needham, MA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |