24,373
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

EASYPARK LOT 22-L2

Vancouver, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

COQ-MUSEUM INFO CENTRE 1

Quesnel, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

THE POST P

Vancouver, BC

Operational Reliability B

69 kW avg peak

63 kW maximum

First tracked Jan 10, 2025

SURREY MITS CT4K-GW1

Vancouver, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

SPMRM ARENA 1

Sun Peaks, BC

Unknown

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

CAPILANO UNIVER LOT#3 NO

North Vancouver, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

POLARIS REALTY STATION 1

Vancouver, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

PARK PLACE PARK PLACE

Vancouver, BC

Operational Reliability C

54 kW avg peak

63 kW maximum

First tracked Jan 10, 2025

FTNT BBY CAMPUS FORTINET

Burnaby, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

FTNT BBY CAMPUS FORTINET

Burnaby, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

LAKESIDETERRACE STATION

Coquitlam, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

COQUITLAM CW EAWCOQ01

Coquitlam, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

E.V. STATION CATHEDRAL

Vancouver, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

RDFFG MCB VALEMOUNT 1

Valemount, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

SLENYAH STORE STORE 1

Fraser Lake, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Jan 10, 2025

Page 281 of 1219

This action cannot be undone.