ChargePoint
B+31,314
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Linthicum Heights, MD
7kW max
Alexandria, VA
7kW max
Groveport, OH
15kW max
Bloomington, IL
7kW max
Normal, IL
7kW max
Salt Lake City, UT
7kW max
Salt Lake City, UT
7kW max
Telluride, CO
7kW max
Salt Lake City, UT
7kW max
Vail, CO
7kW max
Boulder, CO
7kW max
Salt Lake City, UT
7kW max
Broomfield, CO
7kW max
Broomfield, CO
7kW max
Broomfield, CO
7kW max
Nederland, CO
7kW max
Steamboat Springs, CO
19kW max
Telluride, CO
7kW max
Madera, CA
126kW avg
75kW max
Ripon, CA
117kW avg
75kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| FELLO 999 CORPORATE (Linthicum Heights, MD) | — | 7 | 17 Mar | ||
| EV CHARGIING AB1-2 SL NORTH (Alexandria, VA) | — | 7 | 17 Mar | ||
| RICART KIA CUST PARKIN (Groveport, OH) | — | 15 | 17 Mar | ||
| CBEC CENTRAL (Bloomington, IL) | — | 7 | 16 Mar | ||
| HCC CHARGING ST EVL LAB #3 (Normal, IL) | — | 7 | 16 Mar | ||
| U OF U W.VILL 796W (Salt Lake City, UT) | — | 7 | 16 Mar | ||
| U OF U W.VILL 797SE1 (Salt Lake City, UT) | — | 7 | 16 Mar | ||
| KTEX TEX3 (Telluride, CO) | — | 7 | 16 Mar | ||
| U OF U LOT 24 SW2 (Salt Lake City, UT) | — | 7 | 16 Mar | ||
| PIEDMONT WEST STATION 3 (Vail, CO) | — | 7 | 16 Mar | ||
| UPSLOPE BREWING UPSLOPE BREWING (Boulder, CO) | — | 7 | 16 Mar | ||
| U OF U LOT 24 SW1 (Salt Lake City, UT) | — | 7 | 16 Mar | ||
| ARISTA CO EV PS (Broomfield, CO) | — | 7 | 16 Mar | ||
| ARISTA CO EV PS (Broomfield, CO) | — | 7 | 16 Mar | ||
| CCOB-BROOMFIELD CCB (Broomfield, CO) | — | 7 | 16 Mar | ||
| ELDORA ELCP22 (Nederland, CO) | — | 7 | 16 Mar | ||
| STEAMBOAT SPR (Steamboat Springs, CO) | — | 19 | 16 Mar | ||
| KTEX TEX (Telluride, CO) | — | 7 | 16 Mar | ||
| F | LOVE'S 736 - CA #736 DC (Madera, CA) | 126 | 75 | 16 Mar | |
| F | LOVE'S 223 - CA #223 DC (Ripon, CA) | 117 | 75 | 16 Mar |