Doral, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Doral, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2025
Cortland, NY
144 kW avg peak
350 kW maximum
First tracked Jan 31, 2025
London, ON
Average peak power unavailable
40 kW maximum
First tracked Jan 31, 2025
Reno, NV
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2025
Rouyn-Noranda, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2025
Los Angeles, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 31, 2025
Los Angeles, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 31, 2025
Kingston, ON
162 kW avg peak
500 kW maximum
First tracked Jan 30, 2025
Brampton, ON
Average peak power unavailable
12 kW maximum
First tracked Jan 30, 2025
Toronto, ON
Average peak power unavailable
63 kW maximum
First tracked Jan 30, 2025
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2025
Iowa City, IA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2025
London, ON
Average peak power unavailable
63 kW maximum
First tracked Jan 30, 2025
Burlingame, CA
Average peak power unavailable
13 kW maximum
First tracked Jan 30, 2025
Niagara Falls, NY
152 kW avg peak
350 kW maximum
First tracked Jan 29, 2025
Stratford, ON
Average peak power unavailable
7 kW maximum
First tracked Jan 29, 2025
Boston, MA
75 kW avg peak
63 kW maximum
First tracked Jan 29, 2025
Stockton, CA
Average peak power unavailable
19 kW maximum
First tracked Jan 29, 2025
Pensacola, FL
Average peak power unavailable
19 kW maximum
First tracked Jan 29, 2025
Pensacola, FL
Average peak power unavailable
350 kW maximum
First tracked Jan 29, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
MDFR FS68 EVCHRG
Doral, FL
Operational First tracked Jan 31, 2025 |
Operational | — | 7 kW | Jan 31, 2025 |
|
DENNY'S RIVER 0
Cortland, NY Reliability A Operational First tracked Jan 31, 2025 |
Operational | 144 kW | 350 kW | Jan 31, 2025 |
|
UWO MAIN CAMPUS SSB LOWER FC
London, ON
Operational First tracked Jan 31, 2025 |
Operational | — | 40 kW | Jan 31, 2025 |
|
SIERRA MOB 0
Reno, NV
Operational First tracked Jan 31, 2025 |
Operational | — | 7 kW | Jan 31, 2025 |
|
BLAIS155 BLAIS 5
Rouyn-Noranda, QC
Operational First tracked Jan 31, 2025 |
Operational | — | 7 kW | Jan 31, 2025 |
|
REX P
Los Angeles, CA
Operational First tracked Jan 31, 2025 |
Operational | — | 12 kW | Jan 31, 2025 |
|
REX P2
Los Angeles, CA
Operational First tracked Jan 31, 2025 |
Operational | — | 12 kW | Jan 31, 2025 |
|
PETRO-CANADA CP 35326
Kingston, ON Reliability B Operational First tracked Jan 30, 2025 |
Operational | 162 kW | 500 kW | Jan 30, 2025 |
|
POLICARO ACURA STATION 3
Brampton, ON
Operational First tracked Jan 30, 2025 |
Operational | — | 12 kW | Jan 30, 2025 |
|
TRCA HO LEVEL
Toronto, ON
Operational First tracked Jan 30, 2025 |
Operational | — | 63 kW | Jan 30, 2025 |
|
BELLINGHAM CITY MILL 2
Bellingham, WA
Operational First tracked Jan 30, 2025 |
Operational | — | 7 kW | Jan 30, 2025 |
|
UIOWA LOT 21
Iowa City, IA
Operational First tracked Jan 30, 2025 |
Operational | — | 7 kW | Jan 30, 2025 |
|
UWO MAIN CAMPUS SOUTH VALLEY FC
London, ON
Operational First tracked Jan 30, 2025 |
Operational | — | 63 kW | Jan 30, 2025 |
|
TG BURLINGAME EV STATION 7
Burlingame, CA
Operational First tracked Jan 30, 2025 |
Operational | — | 13 kW | Jan 30, 2025 |
|
CAMBRIA HOTEL RAINBOW 0
Niagara Falls, NY Reliability B Operational First tracked Jan 29, 2025 |
Operational | 152 kW | 350 kW | Jan 29, 2025 |
|
PERTH COUNTY COURT HOUSE
Stratford, ON
Operational First tracked Jan 29, 2025 |
Operational | — | 7 kW | Jan 29, 2025 |
|
CITY OF BOSTON TAFT HILL DC
Boston, MA Reliability B Operational First tracked Jan 29, 2025 |
Operational | 75 kW | 63 kW | Jan 29, 2025 |
|
DP DIESEL PERF
Stockton, CA
Operational First tracked Jan 29, 2025 |
Operational | — | 19 kW | Jan 29, 2025 |
|
WORLD FORD CP6021-1
Pensacola, FL
Operational First tracked Jan 29, 2025 |
Operational | — | 19 kW | Jan 29, 2025 |
|
WORLD FORD
Pensacola, FL
Operational First tracked Jan 29, 2025 |
Operational | — | 350 kW | Jan 29, 2025 |