Columbus, GA
Average peak power unavailable
7 kW maximum
First tracked Feb 18, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Columbus, GA
Average peak power unavailable
7 kW maximum
First tracked Feb 18, 2025
Menlo Park, CA
60 kW avg peak
63 kW maximum
First tracked Feb 15, 2025
Los Angeles, CA
Average peak power unavailable
8 kW maximum
First tracked Feb 14, 2025
Rosemead, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 14, 2025
Wenatchee, WA
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Ferndale, MI
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Wallingford, CT
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Cheshire, CT
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Clarksburg, MD
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Myrtle Beach, SC
64 kW avg peak
63 kW maximum
First tracked Feb 13, 2025
Athens, GA
Average peak power unavailable
10 kW maximum
First tracked Feb 13, 2025
Trumansburg, NY
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Trumansburg, NY
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Plantation, FL
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Plantation, FL
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Haverstraw, NY
Average peak power unavailable
12 kW maximum
First tracked Feb 13, 2025
Menlo Park, CA
62 kW avg peak
63 kW maximum
First tracked Feb 13, 2025
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Feb 13, 2025
Hartford, VT
86 kW avg peak
125 kW maximum
First tracked Feb 12, 2025
Seattle, WA
Average peak power unavailable
63 kW maximum
First tracked Feb 12, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
THE CURRENTS 2ND FLOOR LEFT
Columbus, GA
Operational First tracked Feb 18, 2025 |
Operational | — | 7 kW | Feb 18, 2025 |
|
META MPK21.9-0
Menlo Park, CA Reliability A Operational First tracked Feb 15, 2025 |
Operational | 60 kW | 63 kW | Feb 15, 2025 |
|
REX P2 #12
Los Angeles, CA
Operational First tracked Feb 14, 2025 |
Operational | — | 8 kW | Feb 14, 2025 |
|
RCRC STATIONS GARVEY 1
Rosemead, CA
Operational First tracked Feb 14, 2025 |
Operational | — | 7 kW | Feb 14, 2025 |
|
CCPUD NO 1 1
Wenatchee, WA
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
CITY VIEW APTS STATION 2 FERN
Ferndale, MI
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
CHOATE 1 AND 2
Wallingford, CT
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
MAPLECROFT VILL MAPLECROFT BLD
Cheshire, CT
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
MC FLEET MCFR 35-1
Clarksburg, MD
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
FALCON
Myrtle Beach, SC Reliability B Operational First tracked Feb 13, 2025 |
Operational | 64 kW | 63 kW | Feb 13, 2025 |
|
ATHENS BI ATHENS
Athens, GA
Operational First tracked Feb 13, 2025 |
Operational | — | 10 kW | Feb 13, 2025 |
|
INHS VILLAGE GROVE
Trumansburg, NY
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
INHS VILLAGE GROVE 5
Trumansburg, NY
Unknown First tracked Feb 13, 2025 |
Unknown | — | 7 kW | Feb 13, 2025 |
|
BHE PLANTATION MOB
Plantation, FL
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
BHE PLANTATION MOB3
Plantation, FL
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
BAYSIDE CONDO
Haverstraw, NY
Unknown First tracked Feb 13, 2025 |
Unknown | — | 12 kW | Feb 13, 2025 |
|
META MPK21.8-0
Menlo Park, CA Reliability A Operational First tracked Feb 13, 2025 |
Operational | 62 kW | 63 kW | Feb 13, 2025 |
|
LINCOLN SQUARE LS NORTH DUAL
Bellevue, WA
Operational First tracked Feb 13, 2025 |
Operational | — | 7 kW | Feb 13, 2025 |
|
SUMMIT EV STATION
Hartford, VT Reliability A Operational First tracked Feb 12, 2025 |
Operational | 86 kW | 125 kW | Feb 12, 2025 |
|
EVROADWAY WA-G-COLLEGE01
Seattle, WA
Operational First tracked Feb 12, 2025 |
Operational | — | 63 kW | Feb 12, 2025 |