ChargePoint
B+29,973
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Redmond, WA
7kW max
Redmond, WA
7kW max
Seattle, WA
7kW max
Redmond, WA
7kW max
Salem, OR
12kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Redmond, WA
7kW max
Salem, OR
19kW max
Redmond, WA
7kW max
Clayton, DE
7kW max
Cedar Valley, UT
7kW max
Irvine, CA
7kW max
Pflugerville, TX
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| META_REDMOND CANDLEBOX (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND MODERN (Redmond, WA) | — | 7 | 01 Feb | ||
| NORAM DEXTER (Seattle, WA) | — | 7 | 01 Feb | ||
| META_REDMOND MATRIX (Redmond, WA) | — | 7 | 01 Feb | ||
| LIFESOURCE 1 LIFESOURCE (Salem, OR) | — | 12 | 01 Feb | ||
| META_REDMOND ORIGIN 1 (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND DISCOVERY (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND AVALORE (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND X (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND NEVERMIND (Redmond, WA) | — | 7 | 01 Feb | ||
| OCULUS VR WCE (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND ORIGIN 2 (Redmond, WA) | — | 7 | 01 Feb | ||
| META_REDMOND GENESIS (Redmond, WA) | — | 7 | 01 Feb | ||
| OCULUS VR DROP SHOT (Redmond, WA) | — | 7 | 01 Feb | ||
| LIFESOURCE 1 LIFESOURCE 1 (Salem, OR) | — | 19 | 01 Feb | ||
| META_REDMOND WILDSTAR (Redmond, WA) | — | 7 | 01 Feb | ||
| RAIL ROAD SQ STATION 1 (Clayton, DE) | — | 7 | 01 Feb | ||
| NORAM STATION (Cedar Valley, UT) | — | 7 | 01 Feb | ||
| NORAM CHARGER (Irvine, CA) | — | 7 | 01 Feb | ||
| NORAM STATION (Pflugerville, TX) | — | 7 | 01 Feb |