ChargePoint
B+29,963
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Lewiston, ME
7kW max
Cambridge, MA
7kW max
Viroqua, WI
19kW max
Capitol Heights, MD
63kW max
Rialto, CA
7kW max
Rialto, CA
7kW max
Orange Beach, AL
80kW max
San Diego, CA
7kW max
London, ON
10kW max
London, ON
10kW max
Bozeman, MT
7kW max
Raleigh, NC
7kW max
Tigard, OR
7kW max
Wakefield, MA
7kW max
Essex Junction, VT
7kW max
Essex Junction, VT
7kW max
Cortland, NY
134kW avg
200kW max
Madison, WI
8kW max
Verona, NJ
108kW avg
200kW max
Tysons, VA
12kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| BATES COLLEGE BARDWELL ST (Lewiston, ME) | — | 7 | 06 Feb | ||
| CITYOFCAMBRIDGE ST MARY 2 (Cambridge, MA) | — | 7 | 06 Feb | ||
| WTC VIROQUA 2 (Viroqua, WI) | — | 19 | 06 Feb | ||
| POHANKA HYUNDAI VW ENTRANCE (Capitol Heights, MD) | — | 63 | 06 Feb | ||
| LEN RIVER RANCH LENNAR STN 2 (Rialto, CA) | — | 7 | 06 Feb | ||
| LEN RIVER RANCH LENNAR STN 1 (Rialto, CA) | — | 7 | 06 Feb | ||
| CUMB FARMS EVPOINT900161-1 (Orange Beach, AL) | — | 80 | 06 Feb | ||
| ARENA ARENA (San Diego, CA) | — | 7 | 06 Feb | ||
| UWO MAIN CAMPUS SOUTH VALLEY (London, ON) | — | 10 | 06 Feb | ||
| UWO MAIN CAMPUS HURON FLAT (London, ON) | — | 10 | 06 Feb | ||
| MSU BOZEMAN AIH (Bozeman, MT) | — | 7 | 06 Feb | ||
| THE MILES THE MILES (Raleigh, NC) | — | 7 | 06 Feb | ||
| EV COGIR STATION (Tigard, OR) | — | 7 | 06 Feb | ||
| THE PARKSIDE THE PARKSIDE (Wakefield, MA) | — | 7 | 06 Feb | ||
| MANSION LOT 1 ESSEX RESORT (Essex Junction, VT) | — | 7 | 06 Feb | ||
| MANSION LOT 1 ESSEX RESORT (Essex Junction, VT) | — | 7 | 06 Feb | ||
| A | DENNY'S RIVER (Cortland, NY) | 134 | 200 | 06 Feb | |
| SERVICE (Madison, WI) | — | 8 | 06 Feb | ||
| B | L709 EXPP PL (Verona, NJ) | 108 | 200 | 06 Feb | |
| VERSE SPACE 133 (Tysons, VA) | — | 12 | 05 Feb |