Naples, FL
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Naples, FL
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2025
Tampa, FL
Average peak power unavailable
13 kW maximum
First tracked Sep 9, 2025
Bradenton, FL
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2025
Vicksburg, MS
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2025
San Marcos, TX
Average peak power unavailable
17 kW maximum
First tracked Sep 9, 2025
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
Houston, TX
Average peak power unavailable
4 kW maximum
First tracked Sep 9, 2025
Houston, TX
Average peak power unavailable
4 kW maximum
First tracked Sep 9, 2025
College Station, TX
Average peak power unavailable
125 kW maximum
First tracked Sep 9, 2025
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
Sugar Land, TX
Average peak power unavailable
10 kW maximum
First tracked Sep 9, 2025
Las Cruces, NM
Average peak power unavailable
10 kW maximum
First tracked Sep 9, 2025
Santa Teresa, NM
Average peak power unavailable
4 kW maximum
First tracked Sep 9, 2025
Tucson, AZ
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
Chula Vista, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
San Diego, CA
68 kW avg peak
63 kW maximum
First tracked Sep 9, 2025
San Diego, CA
68 kW avg peak
63 kW maximum
First tracked Sep 9, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 9, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
OBE BILTMORE BAY CO
Naples, FL
Operational First tracked Sep 9, 2025 |
Operational | — | 19 kW | Sep 9, 2025 |
|
OBE EMBASSY TAMPA
Tampa, FL
Operational First tracked Sep 9, 2025 |
Operational | — | 13 kW | Sep 9, 2025 |
|
STATIONFIRKINS1 FIRKINS CDJR
Bradenton, FL
Operational First tracked Sep 9, 2025 |
Operational | — | 19 kW | Sep 9, 2025 |
|
KIRK CHEVROLET STATION 4580
Vicksburg, MS
Operational First tracked Sep 9, 2025 |
Operational | — | 63 kW | Sep 9, 2025 |
|
OBE EMBASSY SNMAR
San Marcos, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 17 kW | Sep 9, 2025 |
|
HOUSTON CENTER 2HC ST1
Houston, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |
|
STRATFORD HOUSE STRATFORD HOUSE
Houston, TX
Unknown First tracked Sep 9, 2025 |
Unknown | — | 4 kW | Sep 9, 2025 |
|
STRATFORD HOUSE STRATFORD HOUS2
Houston, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 4 kW | Sep 9, 2025 |
|
TXB #75 STATION
College Station, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 125 kW | Sep 9, 2025 |
|
HOUSTON CENTER RUSK ST1
Houston, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |
|
TOWN SQUARE SLTS
Sugar Land, TX
Operational First tracked Sep 9, 2025 |
Operational | — | 10 kW | Sep 9, 2025 |
|
COPPERSTONE 1 QUAIL RIDGE
Las Cruces, NM
Operational First tracked Sep 9, 2025 |
Operational | — | 10 kW | Sep 9, 2025 |
|
THE RESERVE TH SITE1-BLDG
Santa Teresa, NM
Operational First tracked Sep 9, 2025 |
Operational | — | 4 kW | Sep 9, 2025 |
|
JC HYUNDAI S
Tucson, AZ
Operational First tracked Sep 9, 2025 |
Operational | — | 63 kW | Sep 9, 2025 |
|
SDCOE LINDAVIST MAIN CAMPUS
San Diego, CA
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |
|
SBCS SBCS
Chula Vista, CA
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |
|
SDCOE LINDAVIST MAIN CAMPUS 1
San Diego, CA
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |
|
IQHQ STATION 5
San Diego, CA Reliability B Operational First tracked Sep 9, 2025 |
Operational | 68 kW | 63 kW | Sep 9, 2025 |
|
IQHQ STATION
San Diego, CA Reliability B Operational First tracked Sep 9, 2025 |
Operational | 68 kW | 63 kW | Sep 9, 2025 |
|
IQHQ EVSE
San Diego, CA
Operational First tracked Sep 9, 2025 |
Operational | — | 7 kW | Sep 9, 2025 |