ChargePoint
B+29,925
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
La Mirada, CA
7kW max
Irvine, CA
7kW max
Los Angeles, CA
7kW max
Los Angeles, CA
7kW max
Tallahassee, FL
7kW max
Seguin, TX
125kW max
El Paso, TX
7kW max
Tucson, AZ
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
St. George, UT
7kW max
Gilbert, AZ
12kW max
Half Moon Bay, CA
7kW max
Palo Alto, CA
7kW max
Montezuma, GA
160kW max
Las Cruces, NM
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| IQAIR EV STATION 4 (La Mirada, CA) | — | 7 | 06 Mar | ||
| 1900 MAIN STATION 01 (Irvine, CA) | — | 7 | 06 Mar | ||
| LUSKINOIC STATION 4 (Los Angeles, CA) | — | 7 | 06 Mar | ||
| LUSKINOIC STATION (Los Angeles, CA) | — | 7 | 06 Mar | ||
| LEON COUNTY GOV PSC EMPLOYEE PA (Tallahassee, FL) | — | 7 | 06 Mar | ||
| HALFTIME 3 STATION (Seguin, TX) | — | 125 | 06 Mar | ||
| TTUHSC MSBII STATION 1 (El Paso, TX) | — | 7 | 06 Mar | ||
| RANCHO CNTR INV RANCHO C (Tucson, AZ) | — | 7 | 06 Mar | ||
| SOCIETY MARGO5 (San Diego, CA) | — | 7 | 06 Mar | ||
| SOCIETY MARGO6 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECPW PW A03 A04 (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY FELIX 7 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECCH A (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY BRADBURY 2 (San Diego, CA) | — | 7 | 06 Mar | ||
| SCO W.F.CLINIC (St. George, UT) | — | 7 | 04 Mar | ||
| BROWN 1 CPF 2 (Gilbert, AZ) | — | 12 | 04 Mar | ||
| 719 MAIN ST UNIT A (Half Moon Bay, CA) | — | 7 | 04 Mar | ||
| EV (Palo Alto, CA) | — | 7 | 04 Mar | ||
| GEORGIA POWER MONTEZUMA DC (Montezuma, GA) | — | 160 | 04 Mar | ||
| WILLOW SPRINGS 1300 BLOCK (Las Cruces, NM) | — | 7 | 04 Mar |