ChargePoint
B+30,414
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Bridgewater, MA
7kW max
Bridgewater, MA
7kW max
Bridgewater, MA
7kW max
Bridgewater, MA
7kW max
Walpole, MA
7kW max
Bridgewater, MA
7kW max
Upper Marlboro, MD
19kW max
Louisville, KY
7kW max
Berthoud, CO
19kW max
Dublin, CA
8kW max
Sanford, FL
63kW max
Houston, TX
7kW max
Paducah, KY
63kW max
Show Low, AZ
24kW max
Houston, TX
7kW max
Ashburn, VA
7kW max
Richardson, TX
7kW max
Richardson, TX
7kW max
Saint-Eustache, QC
200kW max
Port Coquitlam, BC
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| DEPT OF CORR BRIDGE CP 1 (Bridgewater, MA) | — | 7 | 04 Feb | ||
| BSU BSUWEY UNIT (Bridgewater, MA) | — | 7 | 04 Feb | ||
| MA DOC 1114 (Bridgewater, MA) | — | 7 | 04 Feb | ||
| BSU DMF UNIT (Bridgewater, MA) | — | 7 | 04 Feb | ||
| DEPT OF CORR CJ-CPA (Walpole, MA) | — | 7 | 04 Feb | ||
| BSU DMF UNIT 3 (Bridgewater, MA) | — | 7 | 04 Feb | ||
| WSSC WRRF 1 (Upper Marlboro, MD) | — | 19 | 04 Feb | ||
| LG&E HYATTHOUSEEAST (Louisville, KY) | — | 7 | 04 Feb | ||
| NORTHERN WATER EVCS-1A (Berthoud, CO) | — | 19 | 04 Feb | ||
| CITY OF DUBLIN DUBLIN SPORTS 2 (Dublin, CA) | — | 8 | 04 Feb | ||
| OPTIMUS CPO SEMINOLE PBLC (Sanford, FL) | — | 63 | 04 Feb | ||
| UH EV STATION TECH BRIDGE (Houston, TX) | — | 7 | 04 Feb | ||
| LARRY STOVESAND STATION 1 (Paducah, KY) | — | 63 | 03 Feb | ||
| HT02038 ABB STATION 1 (Show Low, AZ) | — | 24 | 03 Feb | ||
| UH EV STATION GATEWAY #3 (Houston, TX) | — | 7 | 03 Feb | ||
| LOUDOUN COUNTY BRAMBLETON (Ashburn, VA) | — | 7 | 03 Feb | ||
| QORVO TX CC/STATION (Richardson, TX) | — | 7 | 03 Feb | ||
| QORVO TX CC/STATION 3 (Richardson, TX) | — | 7 | 03 Feb | ||
| PETRO-CANADA 14206 - 1 (Saint-Eustache, QC) | — | 200 | 03 Feb | ||
| BCS4396 STATION (Port Coquitlam, BC) | — | 7 | 03 Feb |