ChargePoint
B+31,251
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Springfield, IL
7kW max
Des Moines, IA
12kW max
Fairway, KS
8kW max
Aspen, CO
7kW max
Fort Collins, CO
7kW max
Fresno, CA
13kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
San Carlos, CA
7kW max
Charlottesville, VA
7kW max
Prince Frederick, MD
4kW max
Manassas, VA
7kW max
Waynesboro, VA
7kW max
Harrisonburg, VA
192kW avg
200kW max
Lake Ridge, VA
7kW max
Harrisonburg, VA
192kW avg
200kW max
Manassas, VA
7kW max
Fredericksburg, VA
19kW max
Fairfax, VA
7kW max
Charlottesville, VA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| SFD STATION 13 (Springfield, IL) | — | 7 | 05 Nov | ||
| HEARTLAND ANIM HEARTLAND ANIM (Des Moines, IA) | — | 12 | 05 Nov | ||
| THE FIELDSTON STATION (Fairway, KS) | — | 8 | 05 Nov | ||
| CITY OF ASPEN RIO GRANDE L2 3 (Aspen, CO) | — | 7 | 05 Nov | ||
| JESSUP FARM PICKLR (Fort Collins, CO) | — | 7 | 05 Nov | ||
| GEA NA FRESNO 1 (Fresno, CA) | — | 13 | 05 Nov | ||
| SPWD WASHOE 9 (Las Vegas, NV) | — | 7 | 05 Nov | ||
| SPWD WASHOE 11 (Las Vegas, NV) | — | 7 | 05 Nov | ||
| WC 800 INDUST 1 (San Carlos, CA) | — | 7 | 05 Nov | ||
| UVA FONTAINE (Charlottesville, VA) | — | 7 | 04 Nov | ||
| BAYSIDE TOYOTA CHEVY (Prince Frederick, MD) | — | 4 | 04 Nov | ||
| 1800 CLUBHOUSE CLUB (Manassas, VA) | — | 7 | 04 Nov | ||
| BLUE RIDGE CHILDRENSMUSEUM (Waynesboro, VA) | — | 7 | 04 Nov | ||
| B | HWY81TRUCKSTOP POWER LINK (Harrisonburg, VA) | 192 | 200 | 04 Nov | |
| WLR STATION 1 WLR EV (Lake Ridge, VA) | — | 7 | 04 Nov | ||
| B | HWY81TRUCKSTOP POWER LINK 1 (Harrisonburg, VA) | 192 | 200 | 04 Nov | |
| GEORGE MASON U HYLTON LOT (Manassas, VA) | — | 7 | 04 Nov | ||
| PUBLISHER (Fredericksburg, VA) | — | 19 | 04 Nov | ||
| FAIRFAX COUNTY MONUMENT PG (Fairfax, VA) | — | 7 | 04 Nov | ||
| PVCC (Charlottesville, VA) | — | 7 | 04 Nov |