San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 14, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 14, 2025
Murrieta, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 14, 2025
Roseburg, OR
Average peak power unavailable
19 kW maximum
First tracked Nov 13, 2025
Eugene, OR
Average peak power unavailable
19 kW maximum
First tracked Nov 13, 2025
Roseburg, OR
Average peak power unavailable
10 kW maximum
First tracked Nov 13, 2025
Klamath Falls, OR
Average peak power unavailable
19 kW maximum
First tracked Nov 13, 2025
Eugene, OR
Average peak power unavailable
8 kW maximum
First tracked Nov 13, 2025
Dunsmuir, CA
70 kW avg peak
63 kW maximum
First tracked Nov 13, 2025
Reno, NV
154 kW avg peak
350 kW maximum
First tracked Nov 13, 2025
Folsom, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
Mount Shasta, CA
119 kW avg peak
63 kW maximum
First tracked Nov 13, 2025
El Dorado Hills, CA
Average peak power unavailable
8 kW maximum
First tracked Nov 13, 2025
Ashland, OR
Average peak power unavailable
12 kW maximum
First tracked Nov 13, 2025
Carson City, NV
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
Goleta, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
Roseville, CA
Average peak power unavailable
19 kW maximum
First tracked Nov 13, 2025
Lakehead, CA
58 kW avg peak
63 kW maximum
First tracked Nov 13, 2025
Roseville, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
Fair Oaks, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
El Dorado Hills, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 13, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
SAN MATEO CNTY SMMC PUBLIC #1
San Mateo, CA
Unknown First tracked Nov 14, 2025 |
Unknown | — | 7 kW | Nov 14, 2025 |
|
CITYOFMURRIETA
Murrieta, CA
Operational First tracked Nov 14, 2025 |
Operational | — | 7 kW | Nov 14, 2025 |
|
L061 CP6K 2
Roseburg, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 19 kW | Nov 13, 2025 |
|
EWEB EWEB - PUBLIC
Eugene, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 19 kW | Nov 13, 2025 |
|
AVIVA HEALTH AVIVA HEALTH
Roseburg, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 10 kW | Nov 13, 2025 |
|
L227 LVL2:CP6 -PUB
Klamath Falls, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 19 kW | Nov 13, 2025 |
|
UO-EMU GSH
Eugene, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 8 kW | Nov 13, 2025 |
|
DC CORRIDOR DUNSMUIR DC
Dunsmuir, CA Reliability A Operational First tracked Nov 13, 2025 |
Operational | 70 kW | 63 kW | Nov 13, 2025 |
|
L145
Reno, NV Reliability B Operational First tracked Nov 13, 2025 |
Operational | 154 kW | 350 kW | Nov 13, 2025 |
|
BV 4100 2840 BIDWELL
Folsom, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |
|
GF4EVA MT SHASTA
Mount Shasta, CA Reliability D Operational First tracked Nov 13, 2025 |
Operational | 119 kW | 63 kW | Nov 13, 2025 |
|
GED GED102
El Dorado Hills, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 8 kW | Nov 13, 2025 |
|
SOU LOT 27
Ashland, OR
Operational First tracked Nov 13, 2025 |
Operational | — | 12 kW | Nov 13, 2025 |
|
MARLETTE STATION
Carson City, NV
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |
|
FC CHARGERS FAIRVIEW #3
Goleta, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |
|
MLIC 925 925 EV
Roseville, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 19 kW | Nov 13, 2025 |
|
GF4EVA LAKEHEAD BB
Lakehead, CA Reliability A Operational First tracked Nov 13, 2025 |
Operational | 58 kW | 63 kW | Nov 13, 2025 |
|
STARBUCKS STORE #7929 LEFT
Roseville, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |
|
FORPD
Fair Oaks, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |
|
OAK RIDGE HS ORHS
El Dorado Hills, CA
Operational First tracked Nov 13, 2025 |
Operational | — | 7 kW | Nov 13, 2025 |