Bellingham, WA
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Bellingham, WA
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Bellingham, WA
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Victoria, BC
Average peak power unavailable
12 kW maximum
First tracked Nov 19, 2025
Duncan, BC
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Sequim, WA
Average peak power unavailable
15 kW maximum
First tracked Nov 19, 2025
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Tulalip, WA
72 kW avg peak
63 kW maximum
First tracked Nov 19, 2025
Victoria, BC
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Arlington, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Everett, WA
Average peak power unavailable
10 kW maximum
First tracked Nov 19, 2025
Walla Walla, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Victoria, BC
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Arlington, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Bothell, WA
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Victoria, BC
Average peak power unavailable
8 kW maximum
First tracked Nov 19, 2025
Arlington, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Tulalip Bay, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
Edmonds, WA
Average peak power unavailable
63 kW maximum
First tracked Nov 19, 2025
Bothell, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 19, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
FAIRHAVENPLAZA FP GARAGE
Bellingham, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
FAIRHAVENPLAZA FP
Bellingham, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
PACIFIC MAZDA MAZ-S
Victoria, BC
Operational First tracked Nov 19, 2025 |
Operational | — | 12 kW | Nov 19, 2025 |
|
BROADSTREET TIMBER #2
Duncan, BC
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
NOLS SQ
Sequim, WA
Unknown First tracked Nov 19, 2025 |
Unknown | — | 15 kW | Nov 19, 2025 |
|
BELLINGHAM CITY HARRIS 1
Bellingham, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
DONNA'S STATION 1
Tulalip, WA Reliability A Operational First tracked Nov 19, 2025 |
Operational | 72 kW | 63 kW | Nov 19, 2025 |
|
BC ASSESSMENT VICTORIA STN
Victoria, BC
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
SNOPUD POWERED MUARL3101#3
Arlington, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
BELLINGHAM CITY HARRIS 2
Bellingham, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
WADOC EVERETT CJC 1
Everett, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 10 kW | Nov 19, 2025 |
|
WHITMAN COLLEGE WC HJT 01
Walla Walla, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
VIC CONF CENTER STATION 7235
Victoria, BC
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
SNOPUD POWERED MUARL3101
Arlington, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
AVIARA EV1
Bothell, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
VIC CONF CENTER STATION 7234
Victoria, BC
Operational First tracked Nov 19, 2025 |
Operational | — | 8 kW | Nov 19, 2025 |
|
HARMONY FLATS HARMONY FLATS
Arlington, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |
|
CHARGEPOINT QA CT4K-GW-5829
Tulalip Bay, WA
Unknown First tracked Nov 19, 2025 |
Unknown | — | 7 kW | Nov 19, 2025 |
|
EDMONDSNISSAN COMMERCIAL 2
Edmonds, WA
Unknown First tracked Nov 19, 2025 |
Unknown | — | 63 kW | Nov 19, 2025 |
|
UWB CASCADIA CC UW PLANT
Bothell, WA
Operational First tracked Nov 19, 2025 |
Operational | — | 7 kW | Nov 19, 2025 |