Augusta, ME
Average peak power unavailable
40 kW maximum
First tracked Nov 22, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Augusta, ME
Average peak power unavailable
40 kW maximum
First tracked Nov 22, 2025
Cookshire-Eaton, QC
Average peak power unavailable
12 kW maximum
First tracked Nov 22, 2025
Bath, ME
Average peak power unavailable
8 kW maximum
First tracked Nov 22, 2025
Oakland, ME
Average peak power unavailable
19 kW maximum
First tracked Nov 22, 2025
Brunswick, ME
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Lewiston, ME
Average peak power unavailable
8 kW maximum
First tracked Nov 22, 2025
Lancaster, NH
88 kW avg peak
125 kW maximum
First tracked Nov 22, 2025
Bethel, ME
Average peak power unavailable
8 kW maximum
First tracked Nov 22, 2025
Johnson, VT
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Auburn, ME
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Bridgton, ME
178 kW avg peak
320 kW maximum
First tracked Nov 22, 2025
Winthrop, ME
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Lac-Drolet, QC
Average peak power unavailable
12 kW maximum
First tracked Nov 22, 2025
Cookshire-Eaton, QC
Average peak power unavailable
12 kW maximum
First tracked Nov 22, 2025
Dover-Foxcroft, ME
Average peak power unavailable
8 kW maximum
First tracked Nov 22, 2025
Augusta, ME
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Trenton, ME
65 kW avg peak
63 kW maximum
First tracked Nov 22, 2025
Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Nov 22, 2025
Colchester, VT
Average peak power unavailable
8 kW maximum
First tracked Nov 22, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CHARLIES KIA L3 CHARLIES CPE250
Augusta, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 40 kW | Nov 22, 2025 |
|
CYSC CDAS AéROPORT #2
Cookshire-Eaton, QC
Operational First tracked Nov 22, 2025 |
Operational | — | 12 kW | Nov 22, 2025 |
|
BHA 520 CENTRE
Bath, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 8 kW | Nov 22, 2025 |
|
CM MOTORS CM FORD
Oakland, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 19 kW | Nov 22, 2025 |
|
BOWDOIN 6 POLAR LOOP
Brunswick, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
BATES COLLEGE UNDERHILL
Lewiston, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 8 kW | Nov 22, 2025 |
|
GMG DCFC LANCASTER
Lancaster, NH Reliability B Operational First tracked Nov 22, 2025 |
Operational | 88 kW | 125 kW | Nov 22, 2025 |
|
ELM ST LOT CHARGER
Bethel, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 8 kW | Nov 22, 2025 |
|
VAC JOHNSON VTSUJ-VAC
Johnson, VT
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
AUBURNME LIBRARY1
Auburn, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
NOURIA BRIDGTON
Bridgton, ME Reliability D Operational First tracked Nov 22, 2025 |
Operational | 178 kW | 320 kW | Nov 22, 2025 |
|
PDL PD1
Winthrop, ME
Unknown First tracked Nov 22, 2025 |
Unknown | — | 7 kW | Nov 22, 2025 |
|
B1_ATTRACTION U1
Lac-Drolet, QC
Operational First tracked Nov 22, 2025 |
Operational | — | 12 kW | Nov 22, 2025 |
|
CYSC CDAS AéROPORT #1
Cookshire-Eaton, QC
Operational First tracked Nov 22, 2025 |
Operational | — | 12 kW | Nov 22, 2025 |
|
TOWN OF D-F DF CHARGER
Dover-Foxcroft, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 8 kW | Nov 22, 2025 |
|
MDOT HQ AUGUSTA HQ
Augusta, ME
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
AGC
Trenton, ME Reliability B Operational First tracked Nov 22, 2025 |
Operational | 65 kW | 63 kW | Nov 22, 2025 |
|
UVM CENT WEST 2
Burlington, VT
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
UVM CENT WEST
Burlington, VT
Operational First tracked Nov 22, 2025 |
Operational | — | 7 kW | Nov 22, 2025 |
|
VERMONT PUBLIC STATION
Colchester, VT
Operational First tracked Nov 22, 2025 |
Operational | — | 8 kW | Nov 22, 2025 |