Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Aug 13, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Aug 13, 2026
Glencoe, IL
Average peak power unavailable
12 kW maximum
First tracked Aug 13, 2026
Portland, OR
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2026
Lathrop, CA
Average peak power unavailable
350 kW maximum
First tracked Aug 13, 2026
Austin, TX
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2026
Toronto, ON
Average peak power unavailable
500 kW maximum
First tracked Aug 12, 2026
Queensbury, NY
Average peak power unavailable
19 kW maximum
First tracked Aug 12, 2026
San Bernardino, CA
Average peak power unavailable
50 kW maximum
First tracked Aug 12, 2026
Brampton, ON
Average peak power unavailable
10 kW maximum
First tracked Aug 12, 2026
Grinnell, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 12, 2026
Lathrop, CA
Average peak power unavailable
350 kW maximum
First tracked Aug 12, 2026
Placerville, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 11, 2026
Orem, UT
Average peak power unavailable
500 kW maximum
First tracked Aug 11, 2026
Indianola, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 11, 2026
Indianola, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 11, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Aug 11, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Aug 11, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Aug 11, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Aug 11, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Aug 11, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CITYOFVANCOUVER JERICHO
Vancouver, BC
Operational First tracked Aug 13, 2026 |
Operational | — | 19 kW | Aug 13, 2026 |
|
TAKIFF CENTER TAKIFF #1
Glencoe, IL
Operational First tracked Aug 13, 2026 |
Operational | — | 12 kW | Aug 13, 2026 |
|
SVC ENTRANCE CPE250
Portland, OR
Operational First tracked Aug 13, 2026 |
Operational | — | 63 kW | Aug 13, 2026 |
|
CHEVRON) F&E CHEVRON 3
Lathrop, CA
Unknown First tracked Aug 13, 2026 |
Unknown | — | 350 kW | Aug 13, 2026 |
|
COA FLEET DC CHARGER
Austin, TX
Operational First tracked Aug 13, 2026 |
Operational | — | 63 kW | Aug 13, 2026 |
|
PETRO-CANADA 59114 - 2
Toronto, ON
Operational First tracked Aug 12, 2026 |
Operational | — | 500 kW | Aug 12, 2026 |
|
KIA EVSE 19KW EVSE
Queensbury, NY
Unknown First tracked Aug 12, 2026 |
Unknown | — | 19 kW | Aug 12, 2026 |
|
SBMWD SBMWD PUBLIC
San Bernardino, CA
Operational First tracked Aug 12, 2026 |
Operational | — | 50 kW | Aug 12, 2026 |
|
METROSCG METRO SC WB 2
Brampton, ON
Operational First tracked Aug 12, 2026 |
Operational | — | 10 kW | Aug 12, 2026 |
|
GRINNELLCOLLEGE STATION 3
Grinnell, IA
Unknown First tracked Aug 12, 2026 |
Unknown | — | 19 kW | Aug 12, 2026 |
|
CHEVRON) F&E CHEVRON
Lathrop, CA
Operational First tracked Aug 12, 2026 |
Operational | — | 350 kW | Aug 12, 2026 |
|
EL DORADO PVILLE LIB
Placerville, CA
Operational First tracked Aug 11, 2026 |
Operational | — | 8 kW | Aug 11, 2026 |
|
CC STATION1 CPPL0002
Orem, UT
Operational First tracked Aug 11, 2026 |
Operational | — | 500 kW | Aug 11, 2026 |
|
DOWNTOWN SQR INDIANOLA 215
Indianola, IA
Operational First tracked Aug 11, 2026 |
Operational | — | 19 kW | Aug 11, 2026 |
|
DOWNTOWN SQR INDIANOLA 106
Indianola, IA
Operational First tracked Aug 11, 2026 |
Operational | — | 19 kW | Aug 11, 2026 |
|
LGH JAMES ST EV 03
Lancaster, PA
Operational First tracked Aug 11, 2026 |
Operational | — | 22 kW | Aug 11, 2026 |
|
LGH JAMES ST EV 06
Lancaster, PA
Operational First tracked Aug 11, 2026 |
Operational | — | 22 kW | Aug 11, 2026 |
|
LGH JAMES ST EV 01
Lancaster, PA
Operational First tracked Aug 11, 2026 |
Operational | — | 22 kW | Aug 11, 2026 |
|
LGH JAMES ST EV 04
Lancaster, PA
Operational First tracked Aug 11, 2026 |
Operational | — | 22 kW | Aug 11, 2026 |
|
LGH JAMES ST EV 02
Lancaster, PA
Operational First tracked Aug 11, 2026 |
Operational | — | 22 kW | Aug 11, 2026 |