Monterey, TN
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Monterey, TN
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Phoenix, AZ
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Phoenix, AZ
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Countryside, IL
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Toledo, OH
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Toledo, OH
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Plainview, NY
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Lawrence Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Los Alamos, NM
66 kW avg peak
19 kW maximum
First tracked Dec 24, 2025
Santa Clara, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 23, 2025
Sand City, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 23, 2025
Talbotton, GA
Average peak power unavailable
160 kW maximum
First tracked Dec 23, 2025
Lethbridge, AB
Average peak power unavailable
8 kW maximum
First tracked Dec 23, 2025
Lake Stevens, WA
Average peak power unavailable
7 kW maximum
First tracked Dec 23, 2025
Saint-Jérôme, QC
Average peak power unavailable
350 kW maximum
First tracked Dec 20, 2025
Fredericton, NB
Average peak power unavailable
10 kW maximum
First tracked Dec 20, 2025
Burlington, VT
Average peak power unavailable
4 kW maximum
First tracked Dec 20, 2025
St. Catharines, ON
Average peak power unavailable
19 kW maximum
First tracked Dec 20, 2025
Geneva, NY
Average peak power unavailable
12 kW maximum
First tracked Dec 20, 2025
Rush, NY
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
SOUTHWIND SOUTHWIND
Monterey, TN
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
SIHI BLDG 4 - 7
Phoenix, AZ
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
SIHI BLDG 4
Phoenix, AZ
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
HYUNDAI COUNTRY GERALD HY
Countryside, IL
Operational First tracked Dec 24, 2025 |
Operational | — | 63 kW | Dec 24, 2025 |
|
BROWNHONDA STATION 1
Toledo, OH
Operational First tracked Dec 24, 2025 |
Operational | — | 63 kW | Dec 24, 2025 |
|
BROWNHONDA STATION 2
Toledo, OH
Operational First tracked Dec 24, 2025 |
Operational | — | 63 kW | Dec 24, 2025 |
|
HILTONGARDENINN HGI EV
Plainview, NY
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
LAWRENCE TWP TOWN HALL PS2
Lawrence Township, NJ
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
LAC DPU MUNI L2
Los Alamos, NM Reliability A Operational First tracked Dec 24, 2025 |
Operational | 66 kW | 19 kW | Dec 24, 2025 |
|
IRVINE CO APTS MONTICE ENVOY 1
Santa Clara, CA
Operational First tracked Dec 23, 2025 |
Operational | — | 7 kW | Dec 23, 2025 |
|
SAND CITY EV STATION
Sand City, CA
Operational First tracked Dec 23, 2025 |
Operational | — | 7 kW | Dec 23, 2025 |
|
GEORGIA POWER TALBOTTON DC
Talbotton, GA
Operational First tracked Dec 23, 2025 |
Operational | — | 160 kW | Dec 23, 2025 |
|
BROADSTREET FAIRMONT
Lethbridge, AB
Operational First tracked Dec 23, 2025 |
Operational | — | 8 kW | Dec 23, 2025 |
|
SLBP STATION
Lake Stevens, WA
Operational First tracked Dec 23, 2025 |
Operational | — | 7 kW | Dec 23, 2025 |
|
RECHARGECO ST-ANTOINE 0
Saint-Jérôme, QC
Operational First tracked Dec 20, 2025 |
Operational | — | 350 kW | Dec 20, 2025 |
|
FT CHARGE
Fredericton, NB
Operational First tracked Dec 20, 2025 |
Operational | — | 10 kW | Dec 20, 2025 |
|
HGI BURLINGTON HGIBURLINGTON
Burlington, VT
Operational First tracked Dec 20, 2025 |
Operational | — | 4 kW | Dec 20, 2025 |
|
PERFORMANCE LEVEL 2
St. Catharines, ON
Operational First tracked Dec 20, 2025 |
Operational | — | 19 kW | Dec 20, 2025 |
|
CITY OF GENEVA VISITORCENTER
Geneva, NY
Operational First tracked Dec 20, 2025 |
Operational | — | 12 kW | Dec 20, 2025 |
|
MONROE COUNTY CDC
Rush, NY
Operational First tracked Dec 20, 2025 |
Operational | — | 7 kW | Dec 20, 2025 |