Iowa City, IA
Average peak power unavailable
7 kW maximum
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Iowa City, IA
Average peak power unavailable
7 kW maximum
Cedar Rapids, IA
Average peak power unavailable
7 kW maximum
Cedar Rapids, IA
148 kW avg peak
150 kW maximum
Cedar Rapids, IA
Average peak power unavailable
7 kW maximum
Cedar Rapids, IA
Average peak power unavailable
7 kW maximum
Cedar Rapids, IA
Average peak power unavailable
7 kW maximum
Cedar Rapids, IA
Average peak power unavailable
7 kW maximum
Manchester, IA
Average peak power unavailable
7 kW maximum
Lansing, IA
Average peak power unavailable
7 kW maximum
Decorah, IA
Average peak power unavailable
7 kW maximum
Decorah, IA
Average peak power unavailable
7 kW maximum
Decorah, IA
Average peak power unavailable
7 kW maximum
Lanesboro, MN
Average peak power unavailable
7 kW maximum
Rochester, MN
90 kW avg peak
120 kW maximum
Rochester, MN
Average peak power unavailable
7 kW maximum
Rochester, MN
Average peak power unavailable
7 kW maximum
Rochester, MN
Average peak power unavailable
7 kW maximum
Hastings, MN
Average peak power unavailable
7 kW maximum
Rochester, MN
Average peak power unavailable
7 kW maximum
Maplewood, MN
Average peak power unavailable
7 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
UIOWA LOT 55
Iowa City, IA
Operational |
Operational | — | 7 kW | — |
|
HOME2 STATION STATION 1
Cedar Rapids, IA
Operational |
Operational | — | 7 kW | — |
|
MAVERIK CEDAR RAPIDS DC
Cedar Rapids, IA Reliability A Unknown |
Unknown | 148 kW | 150 kW | — |
|
COE COLLEGE COE COLLEGE
Cedar Rapids, IA
Operational |
Operational | — | 7 kW | — |
|
625 1ST STREET GAB EV 1
Cedar Rapids, IA
Operational |
Operational | — | 7 kW | — |
|
CID CHARGE PT SHORT TERM 1
Cedar Rapids, IA
Operational |
Operational | — | 7 kW | — |
|
CID CHARGE PT LONG TERM 1
Cedar Rapids, IA
Operational |
Operational | — | 7 kW | — |
|
COMM SAV BANK STATION
Manchester, IA
Unknown |
Unknown | — | 7 kW | — |
|
LANSING EV LANSINGEV1
Lansing, IA
Operational |
Operational | — | 7 kW | — |
|
FAIRFIELD INN DECORAH
Decorah, IA
Operational |
Operational | — | 7 kW | — |
|
LUTHER COLLEGE REGENTS CENTER
Decorah, IA
Operational |
Operational | — | 7 kW | — |
|
LUTHER COLLEGE LIBRARY LOT
Decorah, IA
Operational |
Operational | — | 7 kW | — |
|
LANESBORO BASS POND 0
Lanesboro, MN
Operational |
Operational | — | 7 kW | — |
|
LUTHER BMW
Rochester, MN Reliability C Operational |
Operational | 90 kW | 120 kW | — |
|
HYATT HOUSE STATION 2
Rochester, MN
Unknown |
Unknown | — | 7 kW | — |
|
PARKING 1ST ST PR_1
Rochester, MN
Operational |
Operational | — | 7 kW | — |
|
PARKING RAMP 6 PR_1
Rochester, MN
Operational |
Operational | — | 7 kW | — |
|
CONFLUENCE EV STATION 1
Hastings, MN
Operational |
Operational | — | 7 kW | — |
|
HY VEE RCHSTER 4
Rochester, MN
Operational |
Operational | — | 7 kW | — |
|
3M 229 NORTHLOT
Maplewood, MN
Operational |
Operational | — | 7 kW | — |