ChargePoint EV Chargers for Rivian
B24,231
Sites
83
Avg kW
See your own charging sessions
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Reliability Distribution
A: 2%
B: 3%
C: 1%
Sites
Toledo, OH
7kW max
Toledo, OH
7kW max
Toledo, OH
10kW max
Toledo, OH
7kW max
Toledo, OH
7kW max
Toledo, OH
7kW max
Toledo, OH
7kW max
Toledo, OH
7kW max
Detroit, MI
7kW max
Romulus, MI
130kW avg
113kW max
Detroit, MI
7kW max
Detroit, MI
7kW max
Detroit, MI
7kW max
Detroit, MI
7kW max
Romulus, MI
7kW max
Romulus, MI
7kW max
Romulus, MI
7kW max
Romulus, MI
7kW max
Huron Charter Township, MI
87kW avg
120kW max
Ferndale, MI
12kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| UTOLEDO MC ROCKET HALL (Toledo, OH) | — | 7 | — | ||
| UTOLEDO MC LOT 2 (Toledo, OH) | — | 7 | — | ||
| TPS CHARGING EV LAB (Toledo, OH) | — | 10 | — | ||
| UTOLEDO MC PLANT OPS 1 (Toledo, OH) | — | 7 | — | ||
| UTOLEDO MC ENGINEERING (Toledo, OH) | — | 7 | — | ||
| OVM STATION (Toledo, OH) | — | 7 | — | ||
| GCCG (Toledo, OH) | — | 7 | — | ||
| FORTINDUSTRYSQ FIS (10 (Toledo, OH) | — | 7 | — | ||
| BEDROCK 1ST ST GRG 1 (Detroit, MI) | — | 7 | — | ||
| A | ZOUROB MOBIL MOBIL CHARGER (Romulus, MI) | 130 | 113 | — | |
| BEDROCK QL DATA CTR S (Detroit, MI) | — | 7 | — | ||
| BEDROCK ASSEMBLYUND 1-1 (Detroit, MI) | — | 7 | — | ||
| BEDROCK ASSEMBLYGRG (Detroit, MI) | — | 7 | — | ||
| DTW AIRPORT BLUEDECK 4G (Detroit, MI) | — | 7 | — | ||
| DTW AIRPORT SOUTH CEL LOT (Romulus, MI) | — | 7 | — | ||
| DTW AIRPORT MAC DECK 8B1 (Romulus, MI) | — | 7 | — | ||
| DTW AIRPORT MAC DECK 8B (Romulus, MI) | — | 7 | — | ||
| DTW AIRPORT MCNAMARA VALET (Romulus, MI) | — | 7 | — | ||
| C | REEFERPETERBILT ABB CHARGER (Huron Charter Township, MI) | 87 | 120 | — | |
| FIR (Ferndale, MI) | — | 12 | — |