ChargePoint
B+30,426
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Cookville, NS
7kW max
Rockport, MA
7kW max
Rockport, MA
7kW max
Rockport, MA
7kW max
Rockport, MA
7kW max
Topsham, ME
7kW max
Topsham, ME
24kW max
Topsham, ME
12kW max
Topsham, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Belfast, ME
7kW max
Belfast, ME
78kW avg
63kW max
Belfast, ME
78kW avg
63kW max
Belfast, ME
7kW max
Digby, NS
7kW max
Ellsworth, ME
83kW avg
63kW max
Portland, ME
12kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| LUNENBURG STATION 1 (Cookville, NS) | — | 7 | — | ||
| ROCKPORTMA TRANSFER (Rockport, MA) | — | 7 | — | ||
| ROCKPORTMA TOWN HALL 1 (Rockport, MA) | — | 7 | — | ||
| ROCKPORTMA ANNEX (Rockport, MA) | — | 7 | — | ||
| ROCKPORTMA ATLANTIC (Rockport, MA) | — | 7 | — | ||
| 4 UNION PARK RD STATION (Topsham, ME) | — | 7 | — | ||
| LEE TOYOTA TOPS LEE TOY ABB30 (Topsham, ME) | — | 24 | — | ||
| LEE TOYOTA TOPS (Topsham, ME) | — | 12 | — | ||
| GOODWINSVOLVO CT4021-01 (Topsham, ME) | — | 7 | — | ||
| BOWDOIN STATION 1 (Brunswick, ME) | — | 7 | — | ||
| BOWDOIN BOWDOIN ROUX 1 (Brunswick, ME) | — | 7 | — | ||
| BOWDOIN BOWDOIN ROUX 2 (Brunswick, ME) | — | 7 | — | ||
| MRRA TECHPLACE (Brunswick, ME) | — | 7 | — | ||
| CITY OF BELFAST BRIDGE ST LOT (Belfast, ME) | — | 7 | — | ||
| A | REVISION ENERGY BELFAST CPE #1 (Belfast, ME) | 78 | 63 | — | |
| A | REVISION ENERGY BELFAST CPE #2 (Belfast, ME) | 78 | 63 | — | |
| CITY OF BELFAST BEAVER ST LOT (Belfast, ME) | — | 7 | — | ||
| BRUCEGROUP GMDIGBY (Digby, NS) | — | 7 | — | ||
| B | REVISION ENERGY ELLSWORTH CPE (Ellsworth, ME) | 83 | 63 | — | |
| WEX US PROD WEX EV LAB (Portland, ME) | — | 12 | — |