Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Foster City, CA
Average peak power unavailable
12 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
REDWOOD LIFE 3600 BRIDGE PKY
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CBRE NA002152
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HCP 700CHES
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ORACLE RWSHORE DTECH
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SHOREBREEZE 275 STATION
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 1200 ISLAND DR
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SRWC RWC L3 3
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 3000 BRDG PKY
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 2200 BRIDGE PKY
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BRIDGEPOINTE STATION 1545
San Mateo, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY OF REDWOOD SHORES LIB CS10
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 2000 BRIDGE PKY
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 1300 ISLAND DR
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 3200 BRIDGE PKY
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
TOWERS AT SHORE 205 STATION
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
METRO CENTER
Foster City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 12 kW | Jul 18, 2024 |
|
ORACLE RWSHORE RWS 5OP-0
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SRWC RWC
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ORACLE RWSHORE 420 GARAGE-00
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
REDWOOD LIFE 1600 BR
Redwood City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |