ChargePoint
B+30,185
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Sweet Home, OR
62kW avg
63kW max
Portland, OR
117kW avg
160kW max
San Antonio, TX
12kW max
Longmont, CO
63kW max
Thousand Oaks, CA
7kW max
B
PGE BEA
Beaverton, OR
122kW avg
120kW max
Braintree, MA
15kW max
Middleborough, MA
63kW max
Medford, MA
143kW avg
320kW max
Boston, MA
7kW max
Boston, MA
7kW max
Farmington, CT
63kW max
South Burlington, VT
7kW max
College Park, MD
12kW max
College Park, MD
7kW max
Tysons, VA
7kW max
Colonial Heights, VA
7kW max
Midlothian, VA
7kW max
Mentor, OH
63kW max
Akron, OH
24kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| A | 10TH AVENUE CPE250 #1 (Sweet Home, OR) | 62 | 63 | 27 Aug | |
| A | PGE BEA DCFC (Portland, OR) | 117 | 160 | 27 Aug | |
| INTERCON SA CP (San Antonio, TX) | — | 12 | 26 Aug | ||
| STEVINSON HYUND CPE250 1 (Longmont, CO) | — | 63 | 25 Aug | ||
| 2000 CORPORATE 2000 CCD (Thousand Oaks, CA) | — | 7 | 25 Aug | ||
| B | PGE BEA (Beaverton, OR) | 122 | 120 | 25 Aug | |
| QUIRK HYUNDAI CP6K 1 (Braintree, MA) | — | 15 | 24 Aug | ||
| MIDDLEBOROUGH JACKSON L3 (Middleborough, MA) | — | 63 | 24 Aug | ||
| A | SENTRYFORD PL (Medford, MA) | 143 | 320 | 24 Aug | |
| MCCA LOT ON D 1 (Boston, MA) | — | 7 | 24 Aug | ||
| MCCA LOT ON D 2 (Boston, MA) | — | 7 | 24 Aug | ||
| CHRYSLER 1461 CJDR L3-B (Farmington, CT) | — | 63 | 24 Aug | ||
| UVM BIO-P1 (South Burlington, VT) | — | 7 | 24 Aug | ||
| UMD FLEET (College Park, MD) | — | 12 | 24 Aug | ||
| ATWORTHCP EV 2 (College Park, MD) | — | 7 | 24 Aug | ||
| CAPITAL ONE STATION N (Tysons, VA) | — | 7 | 24 Aug | ||
| SOLD ROW LOYALTY TOYOTA (Colonial Heights, VA) | — | 7 | 24 Aug | ||
| LUXE360 LUXE 360 # 2 (Midlothian, VA) | — | 7 | 24 Aug | ||
| CLASSICTOYOTA CPE250 #1 (Mentor, OH) | — | 63 | 24 Aug | ||
| BMW OF AKRON DC FAST CHARGER (Akron, OH) | — | 24 | 24 Aug |