ChargePoint
B+31,347
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Long Beach, CA
7kW max
Laurel, MD
7kW max
College Park, MD
7kW max
Woburn, MA
7kW max
Woburn, MA
7kW max
Reading, MA
63kW max
Wakefield, MA
7kW max
Reading, MA
7kW max
Reading, MA
7kW max
Reading, MA
7kW max
Glendale, CA
7kW max
Burbank, CA
7kW max
Glendale, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Los Angeles, CA
7kW max
Baldwin Park, CA
7kW max
Burbank, CA
62kW avg
63kW max
Covina, CA
7kW max
Burbank, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| LONG BEACH SOLAR CHARGER 1 (Long Beach, CA) | — | 7 | 28 Oct | ||
| WSSC RGH (Laurel, MD) | — | 7 | 28 Oct | ||
| IKEA USA COLLEGE PARK 1 (College Park, MD) | — | 7 | 28 Oct | ||
| EMERY FLATS BUILDING 2 (B (Woburn, MA) | — | 7 | 28 Oct | ||
| TARGET T1266 STATION (Woburn, MA) | — | 7 | 28 Oct | ||
| NA208940 HND L3 (Reading, MA) | — | 63 | 28 Oct | ||
| LAKESIDE PARK LAKESIDE INN (Wakefield, MA) | — | 7 | 28 Oct | ||
| RMLD READ DEPOT STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| RMLD RMLD ASH ST ST (Reading, MA) | — | 7 | 28 Oct | ||
| RMLD SUMMIT DR STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| DWA CAMPUS DWA-FLOWER-0 (Glendale, CA) | — | 7 | 28 Oct | ||
| IKEA USA BURBANK (Burbank, CA) | — | 7 | 28 Oct | ||
| BRIO BRIOAPARTMENTS (Glendale, CA) | — | 7 | 28 Oct | ||
| IKEA USA BURBANK 3 (Burbank, CA) | — | 7 | 28 Oct | ||
| BWP EV CHARGE VERD&LAKE1 (Burbank, CA) | — | 7 | 28 Oct | ||
| REFRAME STATION (Los Angeles, CA) | — | 7 | 28 Oct | ||
| IN-N-OUT MAIN BLDG 1 (Baldwin Park, CA) | — | 7 | 28 Oct | ||
| A | BWP EV CHARGE DCFC BWP LOT 2 (Burbank, CA) | 62 | 63 | 28 Oct | |
| IKEA USA COVINA (Covina, CA) | — | 7 | 28 Oct | ||
| BWP EV CHARGE 133 EAST O.G (Burbank, CA) | — | 7 | 28 Oct |