Halifax, NS
Average peak power unavailable
63 kW maximum
First tracked Aug 1, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Halifax, NS
Average peak power unavailable
63 kW maximum
First tracked Aug 1, 2024
Scituate, MA
Average peak power unavailable
7 kW maximum
First tracked Aug 1, 2024
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Aug 1, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Aug 1, 2024
Avenal, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 1, 2024
Lamèque, NB
Average peak power unavailable
63 kW maximum
First tracked Jul 31, 2024
Lamèque, NB
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Bedford, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Bristol, CT
Average peak power unavailable
63 kW maximum
First tracked Jul 31, 2024
Rensselaer, NY
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Beacon, NY
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Washington, DC
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Elizabethtown, PA
Average peak power unavailable
19 kW maximum
First tracked Jul 31, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Tulalip, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2024
Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 30, 2024
Sterling, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 30, 2024
Asheboro, NC
Average peak power unavailable
7 kW maximum
First tracked Jul 30, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
VOLVO OF HFX
Halifax, NS
Operational First tracked Aug 1, 2024 |
Operational | — | 63 kW | Aug 1, 2024 |
|
TOWN HALL LIBRARY
Scituate, MA
Operational First tracked Aug 1, 2024 |
Operational | — | 7 kW | Aug 1, 2024 |
|
PRESTIGIEUX PIERREFONDS
Montréal, QC
Operational First tracked Aug 1, 2024 |
Operational | — | 7 kW | Aug 1, 2024 |
|
BRIDGE ON FORBE STATION 1
Pittsburgh, PA
Operational First tracked Aug 1, 2024 |
Operational | — | 7 kW | Aug 1, 2024 |
|
RSUSD E MARIPOSA
Avenal, CA
Operational First tracked Aug 1, 2024 |
Operational | — | 7 kW | Aug 1, 2024 |
|
CPE250 CPE250
Lamèque, NB
Operational First tracked Jul 31, 2024 |
Operational | — | 63 kW | Jul 31, 2024 |
|
CT4 CT4
Lamèque, NB
Unknown First tracked Jul 31, 2024 |
Unknown | — | 7 kW | Jul 31, 2024 |
|
BEDFORD-EVS LANE SCH 20
Bedford, MA
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
CROWLEY NISSAN NISSAN L
Bristol, CT
Operational First tracked Jul 31, 2024 |
Operational | — | 63 kW | Jul 31, 2024 |
|
REGENERON
Rensselaer, NY
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
CITY OF BEACON STATION 1
Beacon, NY
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
CITY MARKET DT SATION 1
Burlington, VT
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
1201 CHARGER 1201 I ST
Washington, DC
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
MASONIC VILLAGE MVE-002
Elizabethtown, PA
Operational First tracked Jul 31, 2024 |
Operational | — | 19 kW | Jul 31, 2024 |
|
BWP EV CHARGE ONTARIO #2
Burbank, CA
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
VIN AT WOODMAN WOODMANSTATION1
Los Angeles, CA
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
NE STATION N
Tulalip, WA
Operational First tracked Jul 31, 2024 |
Operational | — | 7 kW | Jul 31, 2024 |
|
MSL US SURFACE LOT
Burlington, VT
Operational First tracked Jul 30, 2024 |
Operational | — | 7 kW | Jul 30, 2024 |
|
WHITESTAR CLP
Sterling, VA
Operational First tracked Jul 30, 2024 |
Operational | — | 7 kW | Jul 30, 2024 |
|
REVUP5 PORT3
Asheboro, NC
Operational First tracked Jul 30, 2024 |
Operational | — | 7 kW | Jul 30, 2024 |