ChargePoint
B+30,850
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Long Beach, CA
12kW max
Long Beach, CA
7kW max
Long Beach, CA
7kW max
Signal Hill, CA
7kW max
Laurel, MD
7kW max
College Park, MD
7kW max
Wakefield, MA
7kW max
Reading, MA
63kW max
Reading, MA
7kW max
Reading, MA
7kW max
Woburn, MA
7kW max
Woburn, MA
7kW max
Reading, MA
7kW max
Burbank, CA
62kW avg
63kW max
Burbank, CA
7kW max
Los Angeles, CA
7kW max
Burbank, CA
7kW max
Covina, CA
7kW max
Glendale, CA
7kW max
Los Angeles, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| LONG BEACH BMW CHARGER (Long Beach, CA) | — | 12 | 28 Oct | ||
| ESSEX PATHWAYS 0 (Long Beach, CA) | — | 7 | 28 Oct | ||
| LONG BEACH SOLAR CHARGER 1 (Long Beach, CA) | — | 7 | 28 Oct | ||
| MBZ LONG BEACH MBZ LONG BEACH (Signal Hill, CA) | — | 7 | 28 Oct | ||
| WSSC RGH (Laurel, MD) | — | 7 | 28 Oct | ||
| IKEA USA COLLEGE PARK 1 (College Park, MD) | — | 7 | 28 Oct | ||
| LAKESIDE PARK LAKESIDE INN (Wakefield, MA) | — | 7 | 28 Oct | ||
| NA208940 HND L3 (Reading, MA) | — | 63 | 28 Oct | ||
| RMLD RMLD ASH ST ST (Reading, MA) | — | 7 | 28 Oct | ||
| RMLD READ DEPOT STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| EMERY FLATS BUILDING 2 (B (Woburn, MA) | — | 7 | 28 Oct | ||
| TARGET T1266 STATION (Woburn, MA) | — | 7 | 28 Oct | ||
| RMLD SUMMIT DR STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| A | BWP EV CHARGE DCFC BWP LOT 2 (Burbank, CA) | 62 | 63 | 28 Oct | |
| BWP EV CHARGE VERD&LAKE1 (Burbank, CA) | — | 7 | 28 Oct | ||
| REFRAME STATION (Los Angeles, CA) | — | 7 | 28 Oct | ||
| IKEA USA BURBANK 3 (Burbank, CA) | — | 7 | 28 Oct | ||
| IKEA USA COVINA (Covina, CA) | — | 7 | 28 Oct | ||
| BRIO BRIOAPARTMENTS (Glendale, CA) | — | 7 | 28 Oct | ||
| REFRAME STATION 16 (Los Angeles, CA) | — | 7 | 28 Oct |