Santa Clarita, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 9, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Santa Clarita, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 9, 2024
Salem, OR
90 kW avg peak
350 kW maximum
First tracked Oct 9, 2024
Portsmouth, NH
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Portsmouth, NH
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Essex Junction, VT
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
West Palm Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Campton Hills, IL
Average peak power unavailable
10 kW maximum
First tracked Oct 8, 2024
Kimberly, WI
Average peak power unavailable
19 kW maximum
First tracked Oct 8, 2024
Fort Collins, CO
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Vancouver, WA
Average peak power unavailable
19 kW maximum
First tracked Oct 8, 2024
Half Moon Bay, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
San Rafael, CA
Average peak power unavailable
10 kW maximum
First tracked Oct 8, 2024
Shreveport, LA
Average peak power unavailable
7 kW maximum
First tracked Oct 6, 2024
Philadelphia, PA
Average peak power unavailable
12 kW maximum
First tracked Oct 5, 2024
Robbinsville Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Oct 5, 2024
Gananoque, ON
Average peak power unavailable
7 kW maximum
First tracked Oct 5, 2024
London, ON
Average peak power unavailable
8 kW maximum
First tracked Oct 5, 2024
London, ON
Average peak power unavailable
8 kW maximum
First tracked Oct 5, 2024
Alpharetta, GA
Average peak power unavailable
19 kW maximum
First tracked Oct 5, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
STARBUCKS STORE #5498
Santa Clarita, CA
Operational First tracked Oct 9, 2024 |
Operational | — | 7 kW | Oct 9, 2024 |
|
SKYLINE FORD
Salem, OR Reliability A Operational First tracked Oct 9, 2024 |
Operational | 90 kW | 350 kW | Oct 9, 2024 |
|
PRH-2401 PRH
Portsmouth, NH
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
PRH-2401 PRH#1
Portsmouth, NH
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
ESSEX JUNCTION RAILROAD ST
Essex Junction, VT
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
MORSE LIFE THE PALACE
West Palm Beach, FL
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
KANE COUNTY KANE KDOT
Campton Hills, IL
Operational First tracked Oct 8, 2024 |
Operational | — | 10 kW | Oct 8, 2024 |
|
FEST FOODS KIMBERLY
Kimberly, WI
Operational First tracked Oct 8, 2024 |
Operational | — | 19 kW | Oct 8, 2024 |
|
MERIT ELCTRIC FC EV 1
Fort Collins, CO
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
LINC SQUARE EXP LSS P3 248-249
Bellevue, WA
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
CPU CPU EC
Vancouver, WA
Operational First tracked Oct 8, 2024 |
Operational | — | 19 kW | Oct 8, 2024 |
|
HMB HMB-CORREAS ST2
Half Moon Bay, CA
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
CITYOFSANRAFAEL C-ST GARAGE
San Rafael, CA
Operational First tracked Oct 8, 2024 |
Operational | — | 10 kW | Oct 8, 2024 |
|
SIGNATURE AVIAT SIGNATURE AVIAT
Shreveport, LA
Unknown First tracked Oct 6, 2024 |
Unknown | — | 7 kW | Oct 6, 2024 |
|
THE DARIEN DARIEN
Philadelphia, PA
Operational First tracked Oct 5, 2024 |
Operational | — | 12 kW | Oct 5, 2024 |
|
SOUTHSIDE LOFTS SOUTHSIDE
Robbinsville Township, NJ
Operational First tracked Oct 5, 2024 |
Operational | — | 7 kW | Oct 5, 2024 |
|
MTOCP HWY 2 HWY 401 1
Gananoque, ON
Operational First tracked Oct 5, 2024 |
Operational | — | 7 kW | Oct 5, 2024 |
|
UWO MAIN CAMPUS COLLIDER
London, ON
Operational First tracked Oct 5, 2024 |
Operational | — | 8 kW | Oct 5, 2024 |
|
UWO MAIN CAMPUS PHFM STATION
London, ON
Operational First tracked Oct 5, 2024 |
Operational | — | 8 kW | Oct 5, 2024 |
|
ALPHARETTA-KIA FRONT LEVEL 2
Alpharetta, GA
Operational First tracked Oct 5, 2024 |
Operational | — | 19 kW | Oct 5, 2024 |