Greencastle, PA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Greencastle, PA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
40 kW maximum
First tracked May 2, 2026
Camrose, AB
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
35 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
120 kW maximum
First tracked May 2, 2026
Campbell River, BC
Average peak power unavailable
10 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
63 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Woodstock, ON
Average peak power unavailable
15 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Spokane Valley, WA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Sequim, WA
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Wapato, WA
Average peak power unavailable
8 kW maximum
First tracked May 2, 2026
Needham, MA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Framingham, MA
Average peak power unavailable
19 kW maximum
First tracked May 2, 2026
Epping, NH
Average peak power unavailable
125 kW maximum
First tracked May 2, 2026
Wheaton, IL
Average peak power unavailable
63 kW maximum
First tracked May 2, 2026
Posen, IL
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Sun Prairie, WI
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Woodbridge Township, NJ
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
COMMERCE AVE STATION 6
Greencastle, PA
Unknown First tracked May 2, 2026 |
Unknown | — | 7 kW | May 2, 2026 |
|
WATERLOO FORD CHARGER
Edmonton, AB
Unknown First tracked May 2, 2026 |
Unknown | — | 40 kW | May 2, 2026 |
|
CAMROSE TOYOTA CAMROSE 2
Camrose, AB
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
FREEDOM FORD CHARGER
Edmonton, AB
Operational First tracked May 2, 2026 |
Operational | — | 35 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE PLUS
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 120 kW | May 2, 2026 |
|
BROADSTREET CEDAR
Campbell River, BC
Operational First tracked May 2, 2026 |
Operational | — | 10 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 63 kW | May 2, 2026 |
|
REXEL CORPORATE REXEL
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
WOODSTOCKTOYOTA FRONT SHOP
Woodstock, ON
Operational First tracked May 2, 2026 |
Operational | — | 15 kW | May 2, 2026 |
|
CAWTHRA CC CAWTHRA CC
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
LL THERAPY LLCFT
Spokane Valley, WA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
SALISH SEASONS
Sequim, WA
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
WAPATO 1 1
Wapato, WA
Operational First tracked May 2, 2026 |
Operational | — | 8 kW | May 2, 2026 |
|
ROSEMARY RIDGE STATION 1
Needham, MA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
FSU SALEM END MAPLE ST LOT 1
Framingham, MA
Operational First tracked May 2, 2026 |
Operational | — | 19 kW | May 2, 2026 |
|
REVISION ENERGY
Epping, NH
Operational First tracked May 2, 2026 |
Operational | — | 125 kW | May 2, 2026 |
|
DUPAGE CO DUPAGE CARE 1
Wheaton, IL
Operational First tracked May 2, 2026 |
Operational | — | 63 kW | May 2, 2026 |
|
POSEN HALL POSEN HALL
Posen, IL
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
MONARCHY CP6021(50A
Sun Prairie, WI
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
BUILDING 4 STATION 4A
Woodbridge Township, NJ
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |