ChargePoint
B+31,314
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
St. George, UT
7kW max
Gilbert, AZ
12kW max
Half Moon Bay, CA
7kW max
Palo Alto, CA
7kW max
Montezuma, GA
160kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Thousand Oaks, CA
7kW max
Orange, CA
15kW max
Orange, CA
10kW max
Shafter, CA
50kW max
Soledad, CA
8kW max
Miami, FL
7kW max
Montezuma, GA
40kW max
Tucson, AZ
114kW avg
160kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| SOCIETY FELIX 7 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECCH A (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY BRADBURY 2 (San Diego, CA) | — | 7 | 06 Mar | ||
| SCO W.F.CLINIC (St. George, UT) | — | 7 | 04 Mar | ||
| BROWN 1 CPF 2 (Gilbert, AZ) | — | 12 | 04 Mar | ||
| 719 MAIN ST UNIT A (Half Moon Bay, CA) | — | 7 | 04 Mar | ||
| EV (Palo Alto, CA) | — | 7 | 04 Mar | ||
| GEORGIA POWER MONTEZUMA DC (Montezuma, GA) | — | 160 | 04 Mar | ||
| WILLOW SPRINGS 1300 BLOCK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 2 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS MARYS PARK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 1 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| 2000 CORPORATE 2000 CCD (Thousand Oaks, CA) | — | 7 | 02 Mar | ||
| UC UCIMC TRIANGLE LOT 0 (Orange, CA) | — | 15 | 02 Mar | ||
| UCI HEALTH ORANGEWOOD 0 (Orange, CA) | — | 10 | 02 Mar | ||
| RICHLAND 50KW ABB STATION 1 (Shafter, CA) | — | 50 | 02 Mar | ||
| PANDA EXPRESS NESTLES 0 (Soledad, CA) | — | 8 | 02 Mar | ||
| OBE BISCAYNE GARDEN (Miami, FL) | — | 7 | 02 Mar | ||
| GEORGIA POWER MONTEZUMA DC (Montezuma, GA) | — | 40 | 02 Mar | ||
| B | GPM INVESTMENTS 4613 DC (Tucson, AZ) | 114 | 160 | 02 Mar |