Las Cruces, NM
Average peak power unavailable
13 kW maximum
First tracked Aug 15, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Las Cruces, NM
Average peak power unavailable
13 kW maximum
First tracked Aug 15, 2025
Las Cruces, NM
Average peak power unavailable
13 kW maximum
First tracked Aug 15, 2025
Chula Vista, CA
50 kW avg peak
63 kW maximum
First tracked Aug 15, 2025
El Paso, TX
Average peak power unavailable
350 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
El Paso, TX
Average peak power unavailable
63 kW maximum
First tracked Aug 15, 2025
Sierra Vista, AZ
Average peak power unavailable
63 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
El Paso, TX
Average peak power unavailable
19 kW maximum
First tracked Aug 15, 2025
Escondido, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
Carlsbad, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
Tucson, AZ
105 kW avg peak
80 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
COPPERSTONE 1 SITE
Las Cruces, NM
Operational First tracked Aug 15, 2025 |
Operational | — | 13 kW | Aug 15, 2025 |
|
RIDGE AT ORGAN VISTA
Las Cruces, NM
Operational First tracked Aug 15, 2025 |
Operational | — | 13 kW | Aug 15, 2025 |
|
MOSSY CDJR STATION 1
Chula Vista, CA Reliability A Operational First tracked Aug 15, 2025 |
Operational | 50 kW | 63 kW | Aug 15, 2025 |
|
SHAMALEY FORD
El Paso, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 350 kW | Aug 15, 2025 |
|
UNIV OF SD JOAN KROC 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
CHARGEPOINT NLR ELP C#1
El Paso, TX
Unknown First tracked Aug 15, 2025 |
Unknown | — | 63 kW | Aug 15, 2025 |
|
COCHISE COUNTY S
Sierra Vista, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 63 kW | Aug 15, 2025 |
|
UNIV OF SD MANCH 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
IRVINE CO OFC 4415 EASTGATE
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
DGS DGS TP PHF
Oceanside, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
MIRACOSTA EV EV300
Oceanside, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
PRESIDIO PALMS BUILDING
Tucson, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
SHAMALEY FORD CP6021-1
El Paso, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 19 kW | Aug 15, 2025 |
|
GRAPE PARK A
Escondido, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
IRVINE CO OFC 9791 TCD 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
CARLSBAD CA AVIARA PARK
Carlsbad, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
UNIV OF SD ALCALA 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
PASEO SERENO GUEST 01
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
GPM INVESTMENTS 4615 DC
Tucson, AZ Reliability B Operational First tracked Aug 15, 2025 |
Operational | 105 kW | 80 kW | Aug 15, 2025 |
|
UNIV OF SD MANCH 01
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |