ChargePoint
B+29,899
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
El Paso, TX
7kW max
Tucson, AZ
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
St. George, UT
7kW max
Gilbert, AZ
12kW max
Half Moon Bay, CA
7kW max
Palo Alto, CA
7kW max
Montezuma, GA
160kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Thousand Oaks, CA
7kW max
Orange, CA
15kW max
Orange, CA
10kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| TTUHSC MSBII STATION 1 (El Paso, TX) | — | 7 | 06 Mar | ||
| RANCHO CNTR INV RANCHO C (Tucson, AZ) | — | 7 | 06 Mar | ||
| SOCIETY MARGO5 (San Diego, CA) | — | 7 | 06 Mar | ||
| SOCIETY MARGO6 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECPW PW A03 A04 (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY FELIX 7 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECCH A (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY BRADBURY 2 (San Diego, CA) | — | 7 | 06 Mar | ||
| SCO W.F.CLINIC (St. George, UT) | — | 7 | 04 Mar | ||
| BROWN 1 CPF 2 (Gilbert, AZ) | — | 12 | 04 Mar | ||
| 719 MAIN ST UNIT A (Half Moon Bay, CA) | — | 7 | 04 Mar | ||
| EV (Palo Alto, CA) | — | 7 | 04 Mar | ||
| GEORGIA POWER MONTEZUMA DC (Montezuma, GA) | — | 160 | 04 Mar | ||
| WILLOW SPRINGS 1300 BLOCK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 2 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS MARYS PARK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 1 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| 2000 CORPORATE 2000 CCD (Thousand Oaks, CA) | — | 7 | 02 Mar | ||
| UC UCIMC TRIANGLE LOT 0 (Orange, CA) | — | 15 | 02 Mar | ||
| UCI HEALTH ORANGEWOOD 0 (Orange, CA) | — | 10 | 02 Mar |