Charleston, OR
Average peak power unavailable
15 kW maximum
First tracked Jul 18, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Charleston, OR
Average peak power unavailable
15 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Silver Spring, MD
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
White Bear Lake, MN
Average peak power unavailable
10 kW maximum
First tracked Jul 17, 2026
Pawtucket, RI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
West Palm Beach, FL
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Atlanta, GA
Average peak power unavailable
500 kW maximum
First tracked Jul 17, 2026
White Bear Lake, MN
Average peak power unavailable
8 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Westfield, IN
Average peak power unavailable
125 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Davenport, FL
Average peak power unavailable
125 kW maximum
First tracked Jul 16, 2026
Falls Church, VA
Average peak power unavailable
19 kW maximum
First tracked Jul 16, 2026
Arlington, TX
Average peak power unavailable
8 kW maximum
First tracked Jul 16, 2026
Tustin, CA
Average peak power unavailable
350 kW maximum
First tracked Jul 16, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
VC 1 SSNERR EV
Charleston, OR
Operational First tracked Jul 18, 2026 |
Operational | — | 15 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WSSC CONS LAB 1
Silver Spring, MD
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WALSER AUTO FRONT LOT
White Bear Lake, MN
Operational First tracked Jul 17, 2026 |
Operational | — | 10 kW | Jul 17, 2026 |
|
COLLETTE TRAVEL COLLETTEUPPER1
Pawtucket, RI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
CASA MARA BLDG4 BUILDING 2 ST 1
West Palm Beach, FL
Unknown First tracked Jul 17, 2026 |
Unknown | — | 19 kW | Jul 17, 2026 |
|
DELTA AIR LINES DCFC BLDG
Atlanta, GA
Operational First tracked Jul 17, 2026 |
Operational | — | 500 kW | Jul 17, 2026 |
|
LUNDS FOODS WHITE BEAR-1
White Bear Lake, MN
Operational First tracked Jul 17, 2026 |
Operational | — | 8 kW | Jul 17, 2026 |
|
EVCP 1 LOT 2
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
EVCP 1 LOT 19
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
EVCP 1 LOT 2
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
INDY AUTO MAN WESTFIELD
Westfield, IN
Operational First tracked Jul 17, 2026 |
Operational | — | 125 kW | Jul 17, 2026 |
|
EVCP 1 LOT 11
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
EVCP 1 LOT 14
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
OS MANAGED ADVENTHEART
Davenport, FL
Operational First tracked Jul 16, 2026 |
Operational | — | 125 kW | Jul 16, 2026 |
|
CARLINSPRING200 CARLINSPRING
Falls Church, VA
Unknown First tracked Jul 16, 2026 |
Unknown | — | 19 kW | Jul 16, 2026 |
|
GAT6 SPOT1 GATE 6 NORTH-3
Arlington, TX
Unknown First tracked Jul 16, 2026 |
Unknown | — | 8 kW | Jul 16, 2026 |
|
L719 EXPP–PUBLIC–PL1
Tustin, CA
Unknown First tracked Jul 16, 2026 |
Unknown | — | 350 kW | Jul 16, 2026 |