ChargePoint
B+30,823
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Indio, CA
34kW avg
63kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Las Vegas, NV
7kW max
Baker City, OR
62kW avg
40kW max
Spokane, WA
7kW max
Spokane, WA
7kW max
Spokane, WA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| B | DC CORRIDOR CHIRIACO S (Indio, CA) | 34 | 63 | — | |
| MGM RESORTS INT MANDALAY ST 3 (Las Vegas, NV) | — | 7 | — | ||
| LVCCLD WM LIBRARY (Las Vegas, NV) | — | 7 | — | ||
| MGTSTNS (Las Vegas, NV) | — | 7 | — | ||
| SILVERTON HYATT CASINO (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT NY HOTEL ST 1 (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT EXCALIBUR ST (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT EXCALIBUR ST3 (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT LUXOR STAT 1 (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT MGM GRAND ST2 (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT MGM GRAND ST1 (Las Vegas, NV) | — | 7 | — | ||
| MGM RESORTS INT MIRAGE STAT 1 () | — | 7 | — | ||
| LAS VEGAS SANDS VENETIAN L6 ST (Las Vegas, NV) | — | 7 | — | ||
| LAS VEGAS SANDS P (Las Vegas, NV) | — | 7 | — | ||
| LAS VEGAS SANDS PALAZZO P (Las Vegas, NV) | — | 7 | — | ||
| LVCCLD SM LIBRARY (Las Vegas, NV) | — | 7 | — | ||
| A | OTEC BAKER ARMORY (Baker City, OR) | 62 | 40 | — | |
| SPO-EV SPO-EV (Spokane, WA) | — | 7 | — | ||
| COLLEGE HALL MUSIC HALL (Spokane, WA) | — | 7 | — | ||
| COLLEGE HALL CROSBY HOUSE (Spokane, WA) | — | 7 | — |