Tracy, CA
61 kW avg peak
63 kW maximum
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Tracy, CA
61 kW avg peak
63 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
61 kW avg peak
63 kW maximum
Tracy, CA
86 kW avg peak
63 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Tracy, CA
Average peak power unavailable
7 kW maximum
Lodi, CA
62 kW avg peak
63 kW maximum
Lodi, CA
80 kW avg peak
63 kW maximum
Lodi, CA
80 kW avg peak
40 kW maximum
Stockton, CA
Average peak power unavailable
7 kW maximum
Stockton, CA
Average peak power unavailable
7 kW maximum
Stockton, CA
Average peak power unavailable
7 kW maximum
Stockton, CA
Average peak power unavailable
7 kW maximum
Sacramento, CA
Average peak power unavailable
7 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
MHC DC FAST 1
Tracy, CA Reliability A Operational |
Operational | 61 kW | 63 kW | — |
|
TRAC953 CHARGER #3
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
DC CORRIDOR TRACYTARGET
Tracy, CA Reliability B Operational |
Operational | 61 kW | 63 kW | — |
|
7-ELEVEN 32262 TRACY DC
Tracy, CA Reliability C Operational |
Operational | 86 kW | 63 kW | — |
|
TUSD MONTEVISTA MONTE VISTA MS
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
CLOVER EVS CLOVER MS EV
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
TUSD-CENTRAL CENTRAL ES
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
TRACYHIGHSCHOOL TRACY HIGH EV
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
CITY OF TRACY TRANSIT PARKING
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
TUSD - BOHN BOHN ELEM
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
SHAMROCK PH I EV STATION 1
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
SHAMROCK PH I EV STATION 2
Tracy, CA
Operational |
Operational | — | 7 kW | — |
|
GF4EVA LODI SHELL
Lodi, CA Reliability C Operational |
Operational | 62 kW | 63 kW | — |
|
DC CORRIDOR LODI TARGET
Lodi, CA Reliability A Operational |
Operational | 80 kW | 63 kW | — |
|
DC CORRIDOR LODI TARGET DC1
Lodi, CA Reliability A Operational |
Operational | 80 kW | 40 kW | — |
|
FEATHER RIVER FEATHER RIVER
Stockton, CA
Operational |
Operational | — | 7 kW | — |
|
PG&E LINCOLN LINCOLN
Stockton, CA
Operational |
Operational | — | 7 kW | — |
|
UOP CHARGERS LOT 14
Stockton, CA
Operational |
Operational | — | 7 kW | — |
|
UOP CHARGERS LOT 1
Stockton, CA
Operational |
Operational | — | 7 kW | — |
|
CAMPUS EV NORTH
Sacramento, CA
Operational |
Operational | — | 7 kW | — |