Lethbridge, AB
Average peak power unavailable
7 kW maximum
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Lethbridge, AB
Average peak power unavailable
7 kW maximum
Lethbridge, AB
Average peak power unavailable
7 kW maximum
Lethbridge, AB
Average peak power unavailable
7 kW maximum
Tucson, AZ
Average peak power unavailable
7 kW maximum
Winslow, AZ
Average peak power unavailable
7 kW maximum
Winslow, AZ
Average peak power unavailable
19 kW maximum
Coalville, UT
58 kW avg peak
50 kW maximum
Kamas, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Ogden, UT
Average peak power unavailable
7 kW maximum
Uintah, UT
84 kW avg peak
125 kW maximum
Ogden, UT
Average peak power unavailable
7 kW maximum
Ogden, UT
Average peak power unavailable
7 kW maximum
Ogden, UT
Average peak power unavailable
7 kW maximum
Park City, UT
Average peak power unavailable
7 kW maximum
Ogden, UT
Average peak power unavailable
7 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BROADSTREET HORIZON VIEW
Lethbridge, AB
Operational |
Operational | — | 7 kW | — |
|
BROADSTREET HORIZON VIEW
Lethbridge, AB
Operational |
Operational | — | 7 kW | — |
|
DUNLOPFORD DUNLOP STATION
Lethbridge, AB
Operational |
Operational | — | 7 kW | — |
|
TOHONO CHUL TC1
Tucson, AZ
Operational |
Operational | — | 7 kW | — |
|
ST STATI
Winslow, AZ
Operational |
Operational | — | 7 kW | — |
|
LA POSADA HOTEL LA POSADA
Winslow, AZ
Operational |
Operational | — | 19 kW | — |
|
SUMMIT COUNTY COALVILLE
Coalville, UT Reliability C Operational |
Operational | 58 kW | 50 kW | — |
|
SUMMIT COUNTY KAMAS
Kamas, UT
Operational |
Operational | — | 7 kW | — |
|
THE PROSPECTOR LOT 2
Park City, UT
Operational |
Operational | — | 7 kW | — |
|
THE PROSPECTOR LOT 4
Park City, UT
Operational |
Operational | — | 7 kW | — |
|
THE PROSPECTOR LOT 5
Park City, UT
Operational |
Operational | — | 7 kW | — |
|
SCO PARKCITYH
Park City, UT
Operational |
Operational | — | 7 kW | — |
|
SUMMIT COUNTY PC HEALTH
Park City, UT
Operational |
Operational | — | 7 kW | — |
|
SCO MCKAY DEE HOS
Ogden, UT
Operational |
Operational | — | 7 kW | — |
|
VOLVO CAR USA UINTAH DC
Uintah, UT Reliability B Operational |
Operational | 84 kW | 125 kW | — |
|
SCO MCKAY DEE SC_1
Ogden, UT
Operational |
Operational | — | 7 kW | — |
|
WCL MAIN
Ogden, UT
Operational |
Operational | — | 7 kW | — |
|
STATEOFUTDAS DCFSOGDEN
Ogden, UT
Operational |
Operational | — | 7 kW | — |
|
OUTLETS PC EV
Park City, UT
Unknown |
Unknown | — | 7 kW | — |
|
OSD-CNC-EV1 OSD-EVC#1-CNC
Ogden, UT
Operational |
Operational | — | 7 kW | — |