Albuquerque, NM
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Albuquerque, NM
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
Gilbert, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Apache Junction, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Phoenix, AZ
Average peak power unavailable
10 kW maximum
First tracked Aug 15, 2025
Albuquerque, NM
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Albuquerque, NM
Average peak power unavailable
6 kW maximum
First tracked Aug 15, 2025
Phoenix, AZ
Average peak power unavailable
4 kW maximum
First tracked Aug 15, 2025
Durango, CO
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Fort Worth, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Livingston, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Rockwall, TX
Average peak power unavailable
19 kW maximum
First tracked Aug 15, 2025
Richardson, TX
Average peak power unavailable
13 kW maximum
First tracked Aug 15, 2025
Plano, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Auburn, AL
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Smiths Station, AL
198 kW avg peak
200 kW maximum
First tracked Aug 15, 2025
Valley, AL
109 kW avg peak
160 kW maximum
First tracked Aug 15, 2025
Columbus, GA
155 kW avg peak
200 kW maximum
First tracked Aug 15, 2025
Columbus, GA
155 kW avg peak
160 kW maximum
First tracked Aug 15, 2025
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
RIVERWALKLAPAZ SOUTH, LEFT
Albuquerque, NM
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
TUSCANYGP TUSCANY 1
Gilbert, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
COHERE LIFE BR3
Apache Junction, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
DGS NCFRC
Oceanside, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
SOLARA VISTA BLDG 3 ST2
Phoenix, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 10 kW | Aug 15, 2025 |
|
LA MIRAGE
Albuquerque, NM
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
OP OFFICERETAIL STATION 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
NALS 087 RIGHT
Albuquerque, NM
Operational First tracked Aug 15, 2025 |
Operational | — | 6 kW | Aug 15, 2025 |
|
THE PARKING SPT
Phoenix, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 4 kW | Aug 15, 2025 |
|
DURANGO 1785
Durango, CO
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
OBE FW COMO COM CTR
Fort Worth, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
ITC STATION
Livingston, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
FORD OF ROCKWAL CP6000-1
Rockwall, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 19 kW | Aug 15, 2025 |
|
OBE RENAISSANCE RI
Richardson, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 13 kW | Aug 15, 2025 |
|
PLANO STATION
Plano, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
ACCOLADE AUBURN
Auburn, AL
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
LOVE'S 774 - AL #774 DC
Smiths Station, AL Reliability A Operational First tracked Aug 15, 2025 |
Operational | 198 kW | 200 kW | Aug 15, 2025 |
|
OPTIMUS CPO VALLEY BK
Valley, AL Reliability B Operational First tracked Aug 15, 2025 |
Operational | 109 kW | 160 kW | Aug 15, 2025 |
|
LOT CHARGERS
Columbus, GA Reliability A Operational First tracked Aug 15, 2025 |
Operational | 155 kW | 200 kW | Aug 15, 2025 |
|
LOT CHARGERS PWRLINK2000-1
Columbus, GA Reliability A Unknown First tracked Aug 15, 2025 |
Unknown | 155 kW | 160 kW | Aug 15, 2025 |