San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Santee, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Bisbee, AZ
Average peak power unavailable
19 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Tucson, AZ
101 kW avg peak
160 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Carlsbad, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 15, 2025
Escondido, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
El Paso, TX
Average peak power unavailable
19 kW maximum
First tracked Aug 15, 2025
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2025
Sierra Vista, AZ
Average peak power unavailable
63 kW maximum
First tracked Aug 15, 2025
El Paso, TX
Average peak power unavailable
63 kW maximum
First tracked Aug 15, 2025
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
SCRIPPS PLAZA STATION
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
DGS PSB2 C1-243&244
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
UNIV OF SD ALCALA 04
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
SANTANA HS A0
Santee, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
COCHISE COUNTY BISBEE
Bisbee, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 19 kW | Aug 15, 2025 |
|
UNIV OF SD MANCH 01
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
GPM INVESTMENTS 4615 DC
Tucson, AZ Reliability A Operational First tracked Aug 15, 2025 |
Operational | 101 kW | 160 kW | Aug 15, 2025 |
|
PASEO SERENO GUEST 01
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
UNIV OF SD ALCALA 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
CARLSBAD CA AVIARA PARK
Carlsbad, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
IRVINE CO OFC 9791 TCD 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 8 kW | Aug 15, 2025 |
|
GRAPE PARK A
Escondido, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
SHAMALEY FORD CP6021-1
El Paso, TX
Operational First tracked Aug 15, 2025 |
Operational | — | 19 kW | Aug 15, 2025 |
|
PRESIDIO PALMS BUILDING
Tucson, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
MIRACOSTA EV EV300
Oceanside, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
DGS DGS TP PHF
Oceanside, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
IRVINE CO OFC 4415 EASTGATE
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
UNIV OF SD MANCH 0
San Diego, CA
Operational First tracked Aug 15, 2025 |
Operational | — | 7 kW | Aug 15, 2025 |
|
COCHISE COUNTY S
Sierra Vista, AZ
Operational First tracked Aug 15, 2025 |
Operational | — | 63 kW | Aug 15, 2025 |
|
CHARGEPOINT NLR ELP C#1
El Paso, TX
Unknown First tracked Aug 15, 2025 |
Unknown | — | 63 kW | Aug 15, 2025 |