San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Jan 10, 2025
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Las Cruces, NM
85 kW avg peak
125 kW maximum
First tracked Jan 10, 2025
Marble Falls, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Cypress, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Houston, TX
Average peak power unavailable
63 kW maximum
First tracked Jan 10, 2025
Waco, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
OPELOUSAS, LA
Average peak power unavailable
63 kW maximum
First tracked Jan 10, 2025
Covington, LA
Average peak power unavailable
63 kW maximum
First tracked Jan 10, 2025
Mobile, AL
Average peak power unavailable
125 kW maximum
First tracked Jan 10, 2025
Pompano Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Lakeland, FL
Average peak power unavailable
350 kW maximum
First tracked Jan 10, 2025
Bluffton, SC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Tuscaloosa, AL
122 kW avg peak
350 kW maximum
First tracked Jan 10, 2025
Pompano Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Miami, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Aventura, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Boca Raton, FL
Average peak power unavailable
10 kW maximum
First tracked Jan 10, 2025
Pompano Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
IRVINE CO OFC 4370 LJVD 0
San Diego, CA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
SDGE PHASE 2 SPACE
San Diego, CA
Operational First tracked Jan 10, 2025 |
Operational | — | 8 kW | Jan 10, 2025 |
|
IRVINE CO OFC 4370 LJVD 0
San Diego, CA
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
DONA ANA GC EV2
Las Cruces, NM Reliability B Operational First tracked Jan 10, 2025 |
Operational | 85 kW | 125 kW | Jan 10, 2025 |
|
FLATZ 830 STATION
Marble Falls, TX
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
HHMSC VGBC 1
Cypress, TX
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
BIGSTAR HYUNDAI FRONT PL DC
Houston, TX
Operational First tracked Jan 10, 2025 |
Operational | — | 63 kW | Jan 10, 2025 |
|
ELEMENTWACO EV CHARGING #2
Waco, TX
Unknown First tracked Jan 10, 2025 |
Unknown | — | 7 kW | Jan 10, 2025 |
|
STER HYUN-GEN CDJR FRONT
OPELOUSAS, LA
Operational First tracked Jan 10, 2025 |
Operational | — | 63 kW | Jan 10, 2025 |
|
NORTHPARK HYUND
Covington, LA
Operational First tracked Jan 10, 2025 |
Operational | — | 63 kW | Jan 10, 2025 |
|
BMW OF MOBILE 1 CPE250
Mobile, AL
Operational First tracked Jan 10, 2025 |
Operational | — | 125 kW | Jan 10, 2025 |
|
CAPTIVA COVE AP BUILDING 1
Pompano Beach, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
FORD#1 EXPP PL01
Lakeland, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 350 kW | Jan 10, 2025 |
|
GPI CP4021-FRONT
Bluffton, SC
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
TUSCALOOSA FORD POWER LINK
Tuscaloosa, AL Reliability A Operational First tracked Jan 10, 2025 |
Operational | 122 kW | 350 kW | Jan 10, 2025 |
|
CAPTIVA COVE AP BUILDING 2
Pompano Beach, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
SEFC SEFC/LEGACY
Miami, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
OBE PARKSQUARE 3
Aventura, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
BHE WEST BOCA OCED
Boca Raton, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 10 kW | Jan 10, 2025 |
|
CAPTIVA COVE AP BUILDING 3
Pompano Beach, FL
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |