Cleveland, OH
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Cleveland, OH
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Blacksburg, VA
Average peak power unavailable
19 kW maximum
First tracked Dec 20, 2024
Slippery Rock, PA
190 kW avg peak
320 kW maximum
First tracked Dec 20, 2024
Toronto, ON
Average peak power unavailable
19 kW maximum
First tracked Dec 20, 2024
Toronto, ON
Average peak power unavailable
19 kW maximum
First tracked Dec 20, 2024
Washington, DC
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Laurel, MD
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Brossard, QC
171 kW avg peak
200 kW maximum
First tracked Dec 20, 2024
Pittsfield, MA
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Litchfield, CT
62 kW avg peak
63 kW maximum
First tracked Dec 20, 2024
Portland, OR
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
Portland, OR
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
Fort Worth, TX
Average peak power unavailable
19 kW maximum
First tracked Dec 21, 2024
Nebraska City, NE
Average peak power unavailable
19 kW maximum
First tracked Dec 21, 2024
Bay St. Louis, MS
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
Winnetka, IL
Average peak power unavailable
15 kW maximum
First tracked Dec 21, 2024
Témiscaming, QC
88 kW avg peak
125 kW maximum
First tracked Dec 21, 2024
Sylva, NC
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
UCI LOT 22 UCI MAGNOLIA HQ
Cleveland, OH
Operational First tracked Dec 20, 2024 |
Operational | — | 7 kW | Dec 20, 2024 |
|
BBURGRX BLACKSBURG RX
Blacksburg, VA
Operational First tracked Dec 20, 2024 |
Operational | — | 19 kW | Dec 20, 2024 |
|
LOVE'S 731 - PA #731 DC
Slippery Rock, PA Reliability A Operational First tracked Dec 20, 2024 |
Operational | 190 kW | 320 kW | Dec 20, 2024 |
|
GREENP CP11-00
Toronto, ON
Operational First tracked Dec 20, 2024 |
Operational | — | 19 kW | Dec 20, 2024 |
|
GREENP CP11-00
Toronto, ON
Operational First tracked Dec 20, 2024 |
Operational | — | 19 kW | Dec 20, 2024 |
|
HILLWOOD MUSEUM PARKING_DECK
Washington, DC
Operational First tracked Dec 20, 2024 |
Operational | — | 7 kW | Dec 20, 2024 |
|
BW LAUREL BW LAUREL
Laurel, MD
Operational First tracked Dec 20, 2024 |
Operational | — | 7 kW | Dec 20, 2024 |
|
MONTMORENCYFORD PL 1
Brossard, QC Reliability C Operational First tracked Dec 20, 2024 |
Operational | 171 kW | 200 kW | Dec 20, 2024 |
|
DCAMM PSOB
Pittsfield, MA
Unknown First tracked Dec 20, 2024 |
Unknown | — | 7 kW | Dec 20, 2024 |
|
LITCHFIELD MUNI
Litchfield, CT Reliability C Operational First tracked Dec 20, 2024 |
Operational | 62 kW | 63 kW | Dec 20, 2024 |
|
CHARGEPT MAL1 CHARGER
Portland, OR
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
CHARGEPT MAL1 CHARGE
Portland, OR
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
STATION
San Mateo, CA
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
SMBC
San Mateo, CA
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
OBE HOUSTON GARGE
Fort Worth, TX
Operational First tracked Dec 21, 2024 |
Operational | — | 19 kW | Dec 21, 2024 |
|
LIED LODGE
Nebraska City, NE
Operational First tracked Dec 21, 2024 |
Operational | — | 19 kW | Dec 21, 2024 |
|
SILVER SLIPPER SSCH
Bay St. Louis, MS
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
WINNETKA INDIAN HILLL
Winnetka, IL
Operational First tracked Dec 21, 2024 |
Operational | — | 15 kW | Dec 21, 2024 |
|
RECHARGECO TÉMISCAMING 0
Témiscaming, QC Reliability A Operational First tracked Dec 21, 2024 |
Operational | 88 kW | 125 kW | Dec 21, 2024 |
|
NCDOT NCDOT DIV 14
Sylva, NC
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |