East Longmeadow, MA
96 kW avg peak
160 kW maximum
First tracked Dec 14, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
East Longmeadow, MA
96 kW avg peak
160 kW maximum
First tracked Dec 14, 2024
Jacksonville, FL
Average peak power unavailable
12 kW maximum
First tracked Dec 15, 2024
Toronto, ON
Average peak power unavailable
7 kW maximum
First tracked Dec 16, 2024
Toronto, ON
Average peak power unavailable
7 kW maximum
First tracked Dec 16, 2024
Qualicum Beach, BC
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Tucson, AZ
Average peak power unavailable
8 kW maximum
First tracked Dec 17, 2024
Fort Qu'Appelle, SK
Average peak power unavailable
125 kW maximum
First tracked Dec 17, 2024
Windsor, CO
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Frisco, TX
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Kansas City, MO
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Grand Rapids, MI
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Martinsville, VA
Average peak power unavailable
15 kW maximum
First tracked Dec 17, 2024
Whitby, ON
85 kW avg peak
163 kW maximum
First tracked Dec 17, 2024
Beacon, NY
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Châteauguay, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 17, 2024
Hauppauge, NY
Average peak power unavailable
19 kW maximum
First tracked Dec 17, 2024
Puyallup, WA
Average peak power unavailable
7 kW maximum
First tracked Dec 18, 2024
Tigard, OR
Average peak power unavailable
19 kW maximum
First tracked Dec 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
MAYBURY EV MAYBURYEV-0
East Longmeadow, MA Reliability B Operational First tracked Dec 14, 2024 |
Operational | 96 kW | 160 kW | Dec 14, 2024 |
|
GET JUICE KIA ORANGE PARK
Jacksonville, FL
Operational First tracked Dec 15, 2024 |
Operational | — | 12 kW | Dec 15, 2024 |
|
INDIGO PARK CTO426-0
Toronto, ON
Operational First tracked Dec 16, 2024 |
Operational | — | 7 kW | Dec 16, 2024 |
|
INDIGO PARK CTO019-0
Toronto, ON
Operational First tracked Dec 16, 2024 |
Operational | — | 7 kW | Dec 16, 2024 |
|
QUALICUMBEACH MUSEUM 1
Qualicum Beach, BC
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
HGFMV 7420 MVR
San Diego, CA
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
HGFMV 7470 MVR
San Diego, CA
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
HINCHCLIFFE STATION1 PORT
Tucson, AZ
Operational First tracked Dec 17, 2024 |
Operational | — | 8 kW | Dec 17, 2024 |
|
LBB GAS CPE 250
Fort Qu'Appelle, SK
Operational First tracked Dec 17, 2024 |
Operational | — | 125 kW | Dec 17, 2024 |
|
TOWN OF WINDSOR PUBLIC SERV FAC
Windsor, CO
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
HALL PARK 2 HALL PARK S
Frisco, TX
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
BMW KC SOUTH STATION 0
Kansas City, MO
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
432 MONROE PARK STATION
Grand Rapids, MI
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
NELSON AUTOS NELSON RENTAL
Martinsville, VA
Operational First tracked Dec 17, 2024 |
Operational | — | 15 kW | Dec 17, 2024 |
|
WHITBYOSHAWAST WOH 3 PL
Whitby, ON Reliability A Operational First tracked Dec 17, 2024 |
Operational | 85 kW | 163 kW | Dec 17, 2024 |
|
CITY OF BEACON WOLCOTT AVE 2
Beacon, NY
Operational First tracked Dec 17, 2024 |
Operational | — | 7 kW | Dec 17, 2024 |
|
213 INDUSTRIEL STATION 1
Châteauguay, QC
Unknown First tracked Dec 17, 2024 |
Unknown | — | 7 kW | Dec 17, 2024 |
|
DRG 150MP DRG 150MP 2
Hauppauge, NY
Operational First tracked Dec 17, 2024 |
Operational | — | 19 kW | Dec 17, 2024 |
|
THE BOEING CO FRED 24
Puyallup, WA
Operational First tracked Dec 18, 2024 |
Operational | — | 7 kW | Dec 18, 2024 |
|
COURTYARD M T CHARLIE
Tigard, OR
Operational First tracked Dec 18, 2024 |
Operational | — | 19 kW | Dec 18, 2024 |