ChargePoint
B+30,850
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Middleton, NS
7kW max
Saint John, NB
7kW max
Middleton, NS
7kW max
Middleton, NS
7kW max
Middleton, NS
7kW max
Middleton, NS
7kW max
Portland, ME
12kW max
Ellsworth, ME
83kW avg
63kW max
Digby, NS
7kW max
Belfast, ME
7kW max
Belfast, ME
82kW avg
63kW max
Belfast, ME
82kW avg
63kW max
Belfast, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Brunswick, ME
7kW max
Topsham, ME
7kW max
Topsham, ME
12kW max
Topsham, ME
24kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| BRUCEGROUP 259 MAIN (Middleton, NS) | — | 7 | — | ||
| SJENERGY 90 PARADISE ROW (Saint John, NB) | — | 7 | — | ||
| BRUCEGROUP 90COMMERCIAL (Middleton, NS) | — | 7 | — | ||
| BRUCEGROUP BRUCEGM (Middleton, NS) | — | 7 | — | ||
| BRUCEGROUP BRUCEFORD (Middleton, NS) | — | 7 | — | ||
| NOVA SCOTIA STATION 1 (Middleton, NS) | — | 7 | — | ||
| WEX US PROD WEX EV LAB (Portland, ME) | — | 12 | — | ||
| B | REVISION ENERGY ELLSWORTH CPE (Ellsworth, ME) | 83 | 63 | — | |
| BRUCEGROUP GMDIGBY (Digby, NS) | — | 7 | — | ||
| CITY OF BELFAST BEAVER ST LOT (Belfast, ME) | — | 7 | — | ||
| A | REVISION ENERGY BELFAST CPE #2 (Belfast, ME) | 82 | 63 | — | |
| A | REVISION ENERGY BELFAST CPE #1 (Belfast, ME) | 82 | 63 | — | |
| CITY OF BELFAST BRIDGE ST LOT (Belfast, ME) | — | 7 | — | ||
| MRRA TECHPLACE (Brunswick, ME) | — | 7 | — | ||
| BOWDOIN BOWDOIN ROUX 2 (Brunswick, ME) | — | 7 | — | ||
| BOWDOIN BOWDOIN ROUX 1 (Brunswick, ME) | — | 7 | — | ||
| BOWDOIN STATION 1 (Brunswick, ME) | — | 7 | — | ||
| GOODWINSVOLVO CT4021-01 (Topsham, ME) | — | 7 | — | ||
| LEE TOYOTA TOPS (Topsham, ME) | — | 12 | — | ||
| LEE TOYOTA TOPS LEE TOY ABB30 (Topsham, ME) | — | 24 | — |