Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 28, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
IRVINE CO OFC CBC 153 TECH 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17600 48
Irvine, CA
Unknown First tracked Oct 28, 2024 |
Unknown | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17600 49
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC DBC 46DISCVRY
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC LBP 15370BARR
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC CBC 165 TECH 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17800 6
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17700 5
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17240
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17500
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC SPECTRUM CT 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC FTP 201 TECH 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC IBC 7555 ICD 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17900 7
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17540 4
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC 2 JENNER 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC DBC 38DISCVRY
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC ST 17100 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |
|
IRVINE CO OFC 140 TECH 0
Irvine, CA
Operational First tracked Oct 28, 2024 |
Operational | — | 7 kW | Oct 28, 2024 |