Louisville, KY
Average peak power unavailable
7 kW maximum
First tracked Aug 13, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Louisville, KY
Average peak power unavailable
7 kW maximum
First tracked Aug 13, 2024
Brampton, ON
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2024
Brampton, ON
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2024
Lakewood, NJ
Average peak power unavailable
24 kW maximum
First tracked Aug 13, 2024
Duncan, BC
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Walnut Creek, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Dwight, IL
Average peak power unavailable
10 kW maximum
First tracked Aug 14, 2024
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Doral, FL
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Fairmont, WV
62 kW avg peak
63 kW maximum
First tracked Aug 14, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Chapel Hill, NC
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Ottawa, ON
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Ottawa, ON
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Washington, DC
Average peak power unavailable
7 kW maximum
First tracked Aug 14, 2024
Camden, TN
89 kW avg peak
125 kW maximum
First tracked Aug 15, 2024
Napa, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2024
Jourdanton, TX
Average peak power unavailable
12 kW maximum
First tracked Aug 15, 2024
Olathe, KS
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2024
Columbia, KY
Average peak power unavailable
7 kW maximum
First tracked Aug 15, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
LG&E AB SAWYER PARK
Louisville, KY
Operational First tracked Aug 13, 2024 |
Operational | — | 7 kW | Aug 13, 2024 |
|
ALECTRA EV
Brampton, ON
Operational First tracked Aug 13, 2024 |
Operational | — | 63 kW | Aug 13, 2024 |
|
ALECTRA EV-7
Brampton, ON
Operational First tracked Aug 13, 2024 |
Operational | — | 63 kW | Aug 13, 2024 |
|
UNIVERSE 1 HU ABB
Lakewood, NJ
Operational First tracked Aug 13, 2024 |
Operational | — | 24 kW | Aug 13, 2024 |
|
BROADSTREET WILLOWS
Duncan, BC
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
MT DIABLO MT DIABLO
Walnut Creek, CA
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
RENFREW PARK RENFREW PARK
Dwight, IL
Operational First tracked Aug 14, 2024 |
Operational | — | 10 kW | Aug 14, 2024 |
|
FOUNDATION FOUNDATION
Champaign, IL
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
BHE BHH DORAL
Doral, FL
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
FMCTA FAST CHARGER
Fairmont, WV Reliability B Operational First tracked Aug 14, 2024 |
Operational | 62 kW | 63 kW | Aug 14, 2024 |
|
SOUTH GARAGE G-1
Pittsburgh, PA
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
CHAPEL HILL, NC ROSEMARY 1
Chapel Hill, NC
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
HOLLOWAY CO SL STATION 1
Ottawa, ON
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
HOLLOWAY CO SL
Ottawa, ON
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
RRBPARKING
Washington, DC
Operational First tracked Aug 14, 2024 |
Operational | — | 7 kW | Aug 14, 2024 |
|
BCES STATION
Camden, TN Reliability A Unknown First tracked Aug 15, 2024 |
Unknown | 89 kW | 125 kW | Aug 15, 2024 |
|
NVTA IMOLA P&R
Napa, CA
Operational First tracked Aug 15, 2024 |
Operational | — | 7 kW | Aug 15, 2024 |
|
MHS1LOADING DOC STATION 2
Jourdanton, TX
Operational First tracked Aug 15, 2024 |
Operational | — | 12 kW | Aug 15, 2024 |
|
HY VEE OLATHE 1
Olathe, KS
Operational First tracked Aug 15, 2024 |
Operational | — | 7 kW | Aug 15, 2024 |
|
COLUMBIA M LOT CITY HALL
Columbia, KY
Operational First tracked Aug 15, 2024 |
Operational | — | 7 kW | Aug 15, 2024 |