ChargePoint
B+
29,080
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
636 (2%)
B
636 (2%)
C
176 (1%)
D
39 (0%)
F
17 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| MAINTENANCE OFF DEMETRE AVE #1 | Sacramento, CA |
|
7 kW | – | – |
|
– |
| APEX APTS APEX APTS | Sacramento, CA |
|
7 kW | – | – |
|
– |
| EVSP WALGREENS STORE 4170 | Sacramento, CA |
|
7 kW | – | – |
|
– |
| THE PHOENIX SAC THE PHOENIX SAC | Sacramento, CA |
|
7 kW | – | – |
|
– |
| CAMPUS EV SOUTH | Sacramento, CA |
|
7 kW | – | – |
|
– |
| CAMPUS EV NORTH | Sacramento, CA |
|
7 kW | – | – |
|
– |
| UOP CHARGERS LOT 1 | Stockton, CA |
|
7 kW | – | – |
|
– |
| UOP CHARGERS LOT 14 | Stockton, CA |
|
7 kW | – | – |
|
– |
| PG&E LINCOLN LINCOLN | Stockton, CA |
|
7 kW | – | – |
|
– |
| FEATHER RIVER FEATHER RIVER | Stockton, CA |
|
7 kW | – | – |
|
– |
| DC CORRIDOR LODI TARGET DC1 | Lodi, CA |
|
40 kW | 57 kW | B |
|
– |
| DC CORRIDOR LODI TARGET | Lodi, CA |
|
40 kW | 57 kW | B |
|
– |
| DC CORRIDOR TARGET S | Stockton, CA |
|
63 kW | 65 kW | A |
|
– |
| DC CORRIDOR LODI SHELL | Lodi, CA |
|
63 kW | 62 kW | B |
|
– |
| GF4EVA LODI SHELL | Lodi, CA |
|
63 kW | – | – |
|
– |
| SHAMROCK PH I EV STATION 2 | Tracy, CA |
|
7 kW | – | – |
|
– |
| SHAMROCK PH I EV STATION 1 | Tracy, CA |
|
7 kW | – | – |
|
– |
| TUSD - BOHN BOHN ELEM | Tracy, CA |
|
7 kW | – | – |
|
– |
| CITY OF TRACY TRANSIT PARKING | Tracy, CA |
|
7 kW | – | – |
|
– |
| TRACYHIGHSCHOOL TRACY HIGH EV | Tracy, CA |
|
7 kW | – | – |
|
– |