ChargePoint

B+
29,080
Total Sites
79
Avg Peak kW
Site Reliability Distribution

Site uptime and performance grades.

A 636 (2%)
B 636 (2%)
C 176 (1%)
D 39 (0%)
F 17 (0%)

ChargePoint Charging Locations

Site reliability grade
Operational / Issues
Name Location
Amenities
MAINTENANCE OFF DEMETRE AVE #1 Sacramento, CA
7 kW
APEX APTS APEX APTS Sacramento, CA
7 kW
EVSP WALGREENS STORE 4170 Sacramento, CA
7 kW
THE PHOENIX SAC THE PHOENIX SAC Sacramento, CA
7 kW
CAMPUS EV SOUTH Sacramento, CA
7 kW
CAMPUS EV NORTH Sacramento, CA
7 kW
UOP CHARGERS LOT 1 Stockton, CA
7 kW
UOP CHARGERS LOT 14 Stockton, CA
7 kW
PG&E LINCOLN LINCOLN Stockton, CA
7 kW
FEATHER RIVER FEATHER RIVER Stockton, CA
7 kW
DC CORRIDOR LODI TARGET DC1 Lodi, CA
40 kW 57 kW B
DC CORRIDOR LODI TARGET Lodi, CA
40 kW 57 kW B
DC CORRIDOR TARGET S Stockton, CA
63 kW 65 kW A
DC CORRIDOR LODI SHELL Lodi, CA
63 kW 62 kW B
GF4EVA LODI SHELL Lodi, CA
63 kW
SHAMROCK PH I EV STATION 2 Tracy, CA
7 kW
SHAMROCK PH I EV STATION 1 Tracy, CA
7 kW
TUSD - BOHN BOHN ELEM Tracy, CA
7 kW
CITY OF TRACY TRANSIT PARKING Tracy, CA
7 kW
TRACYHIGHSCHOOL TRACY HIGH EV Tracy, CA
7 kW
Page 76 of 1454