Brea, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Brea, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Stanton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellflower, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Stanton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
City of Industry, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Hawaiian Gardens, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Stanton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cypress, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
BELLFLOWER, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
CSG EV CITY OF BREA
Brea, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON R1 - 04
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 13&14
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
STANTON STATION 127
Stanton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BELLFLOWER CITY S
Bellflower, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON CORP DR 0
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
STANTON EV 3
Stanton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 0
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MAGIC PARKING DLH
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PH TOYOTA CT4013
City of Industry, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PUBLIC HGCDD02
Hawaiian Gardens, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
STANTON EV 2
Stanton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITYOFCYPRESS CERRITOS
Cypress, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 21&22
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PIXAR PALS PIXAR
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON COLLEGE PARK 0
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
LOBBY
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
S
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HOWARD CDM THE EXCHANGE
BELLFLOWER, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |