Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
12 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Mercer Island, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
BELLEVUE PLACE BELL PLACE
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ALLEY 111 CP
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 12 kW | Jul 18, 2024 |
|
AMZ SEA106
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
KGIP BELL SOUTH STATION 1
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
KGIP BELL SOUTH STATION 2
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
KRC SKYLINE S
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
KGIP BELL SOUTH STATION 3
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
OBC STATION 1
Bellevue, WA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
NOJO 1288 NOJO
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
AMZ SEA94
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CWP CCP
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
NOJO 1288 NOJO 15
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HAMPTON INN
Bellevue, WA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
LINC SQUARE EXP LSS P2 10
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UDR ASHTON BELL
Bellevue, WA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
UWMC UWMC #1
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
LINC SQUARE EXP LSS P2 92-93
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UDR TEN20
Bellevue, WA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
ALJOYA 1 EV CHARGER
Mercer Island, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
LINC SQUARE EXP LSE P2 #2
Bellevue, WA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |