ChargePoint
B+
29,067
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
635 (2%)
B
637 (2%)
C
175 (1%)
D
39 (0%)
F
17 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| SD34 ERM-STATION 1 | Abbotsford, BC |
|
7 kW | – | – |
|
– |
| ORTA SALES | Abbotsford, BC |
|
7 kW | – | – |
|
– |
| ABBOTSFORD VW | Abbotsford, BC |
|
24 kW | – | – |
|
– |
| BARKLEY VILLAGE CORNERSTONE 1 | Bellingham, WA |
|
7 kW | – | – |
|
– |
| BARKLEY VILLAGE REGAL CINEMA 2 | Bellingham, WA |
|
7 kW | – | – |
|
– |
| BELLINGHAM CITY NEVADA 1 | Bellingham, WA |
|
7 kW | – | – |
|
– |
| BELLINGHAM CITY | Bellingham, WA |
|
63 kW | – | – |
|
– |
| TOBELLINGHAM TOB 1 | Bellingham, WA |
|
7 kW | – | – |
|
– |
| LJ HYUNDAI CP | Everett, WA |
|
63 kW | – | – |
|
– |
| TARGET T0337 STATION | Everett, WA |
|
7 kW | – | – |
|
– |
| KIA OF EVERETT KIA OF EVERETT | Everett, WA |
|
63 kW | – | – |
|
– |
| NISSAN-EVERETT DC STATION 2 | Everett, WA |
|
63 kW | – | – |
|
– |
| NISSAN-EVERETT DC STATION 1 | Everett, WA |
|
63 kW | – | – |
|
– |
| LAC SWIN LIBRAR LACSWIN LIBRARY | La Conner, WA |
|
7 kW | – | – |
|
– |
| WASHINGTON ST LACONNER #1 | La Conner, WA |
|
7 kW | – | – |
|
– |
| HARBOUR POINT HBP STATION A | Mukilteo, WA |
|
7 kW | – | – |
|
– |
| UWB CASCADIA CC SOUTH L 3 N | Bothell, WA |
|
7 kW | – | – |
|
– |
| UWB CASCADIA CC SOUTH LEVEL 4 | Bothell, WA |
|
7 kW | – | – |
|
– |
| UWB CASCADIA CC NORTH LEVEL 3 | Bothell, WA |
|
7 kW | – | – |
|
– |
| UWB CASCADIA CC | Bothell, WA |
|
7 kW | – | – |
|
– |