ChargePoint
B+
28,901
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
640 (2%)
B
627 (2%)
C
174 (1%)
D
38 (0%)
F
18 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| KISHHEALTH KISHHEALTH 1 |
|
7 kW | – | – |
|
– | |
| KISHHEALTH KISH HEALTH |
|
7 kW | – | – |
|
– | |
| HAPPY SALES | Oak Lawn, IL |
|
63 kW | – | – |
|
– |
| SHIFT PROVECTUS SHIFT ENERGY GR |
|
7 kW | – | – |
|
– | |
| KEYSIGHT-TECH STATION 2 |
|
7 kW | – | – |
|
– | |
| KOHL'S - CHPT 1178 CARMEL 2 |
|
7 kW | – | – |
|
– | |
| KOHL'S - CHPT 1178 CARMEL 1 |
|
7 kW | – | – |
|
– | |
| 233 E GRAND NEXUS PG-L | South San Francisco, CA |
|
7 kW | – | – |
|
– |
| CBRE 180 KIMBALL | South San Francisco, CA |
|
7 kW | – | – |
|
– |
| DRIVE 1 SATILLITE STORE |
|
24 kW | – | – |
|
– | |
| E | San Diego, CA |
|
7 kW | – | – |
|
– |
| NISSAN NORMAN NISSAN CP6K |
|
19 kW | – | – |
|
– | |
| OMAHA |
|
7 kW | – | – |
|
– | |
| OMAHA |
|
7 kW | – | – |
|
– | |
| GENESIS MILWAUK GENESIS | Waukesha, WI |
|
63 kW | – | – |
|
– |
| LEIDOS WL LEDIOS WL 4KTST |
|
7 kW | – | – |
|
– | |
| CAMWATERPL2 HESPELER ARENA | Cambridge, ON |
|
7 kW | – | – |
|
– |
| 45 TYLER STREET STATION | Cambridge, ON |
|
7 kW | – | – |
|
– |
| BGO - MTC 10 DR. STATION | Brampton, ON |
|
7 kW | – | – |
|
– |
| BGO - MTC 70 DR. STATION | Brampton, ON |
|
7 kW | – | – |
|
– |